The Act concerns the improvement of the road section of E.O. LARISAS TRIKALON, from the level Node (I/K) Terpsithea to the off-road Node (R/K) Rachoulas, 5.473 km long, including the road adjustments to the existing road beginning and end, as well as the corresponding side network. Its construction concludes the intervention at the National Road of Larissa – Trikala which acquires characteristics of a modern motorway along its entire length.
The project consists mainly of two sections:
Section A: From I/K Terpsithea to Cutted Earth 3.419 m.
Section B: From Cutted Earth to Rachoula A/K, length 2.054 m.