The project concerns the replacement of the Central Water Pipeline from the reservoir, with a capacity of 200 m², at Damari Tsipou, located at DK Lithakia, to the Central Water Supply Tank (D26) Bochali position of the IR Zakynthion, with a capacity of 2880 m².In particular, the operation concerns the completion of the construction of the pipeline D2 and D3 (Uper 1), Archaeologist’s services (Project 2). The new pipeline is going to replace the existing steel pipe, which presents problems with both engraving and increased leakage.