Increase the accessibility of rural areas located close to the TEN-T corridor (Constanţa – Tulcea – Braila – Galati) by upgrading the county road section DJ222B Stejaru-Cerna. The modernisation of this county road route will contribute to the development of the business environment, labour mobility, maintenance and creation of new jobs, improving the living standards of the local population. The development of the most economical connection for the service of the population in the area crossed by the Stejaru – Topolog – Dorobanţu – Cerna route is a priority because at present, the existing asphalt roads are degraded and others are cobbled or from the ground, not ensuring normal conditions of comfort and safety. The rehabilitation works proposed by the project for the route Stejaru – Topolog – Dorobanţu – Cerna aim to bring the road systems to the technical parameters corresponding to the category of road, thus ensuring optimal conditions of safety and comfort in motor and pedestrian traffic, as well as a substantial reduction of travel time by streamlining traffic. The project proposes the rehabilitation of the road structure, sized in such a way as to comply with the conditions imposed by the standards in force, correction of geometric elements in plane and longitudinal profile, drainage and discharge of rainwater, classification of the platform for technical class IV, road marking and signalling and information. The location of the access roads, which is the subject of this project, is located in the geomorphic unit of Northern Dobrogea and is presented as a hilly region with medium slopes. Roads generally follow the terrain, with no particular geomorphic characteristics affecting the overall stability of the area. In order to achieve the general objective, we have identified the route Stejaru – Topolog – Dorobanţu – Cerna that requires modernisation.