The project “Design of the Port of Omiš — II Construction Phase” is the reconstruction and expansion of the Omiš port, which will ensure optimum conditions for the provision of public passenger shipping throughout the year and will set up a new regular shipping line with Postiama on the island of Brač. The new port will consist of a land part and a sea aquori, which will increase to a total of 745 m coastline for mooring inside the protected zone and a further 280 m of berth on the external breakwater. The total value of the project is HRK 81.117.036,74, of which HRK 50.836.370,93 is the eligible costs and the remaining HRK 30.280.665,81 is ineligible costs. The total duration of the project is 43 months.