The aim of the project is the external connection of the port of Sućuraj to improve the quality of life of the local population through better transport links to the mainland, which will have an impact on the reduction of the depopulation of the island population. The total value of the project is 21.804.654,56cn. Total ineligible costs are HRK 343.562,50 (buy-in of power and geotechnical project).The total eligible costs are 21.461.092,06cn. The total amount of the grant is HRK 21.390.543,44 out of which Cohesion Fund is planned to be set at HRK 18.181.961,92, from the State budget of the Republic of Croatia for the year 3.208.581,52n. The duration of the project is 79 months. (6/2015.-12/2021.)