The project covers investments in water and waste water supply and treatment systems to achieve the requirements of the EU Directives. The target group includes residents connected to the existing drainage system and those who will be connected after implementation, as well as a new UPOV and all inhabitants connected to a water supply. The implementation of the project is divided into two phases through two Operational Programmes (OPJO and OPCC). The total eligible costs of phase 2 (OPCC) are HRK 314.14 million, out of which 221.83 million HRK refers to grants.