Start date: 30 August 2019
End date: 31 January 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 700 765,14 €
EU contribution: 518 215,83 € (73,95%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Śląskiego, Urząd Marszałkowski Województwa Śląskiego

Increasing the accessibility of investment areas through the construction of Zachnika Street in Tarnowskie Góry

The object of the project is the construction of Zachnika Street in Tarnowskie Góry. The built road will have a length of 263 m and a width of 6.0 m (with local extension within the horizontal arcs up to 6.50 m). A 2,0 m wide pavement with concrete cubes will be built along the roadway on the eastern side. To connect the planned section of the road from ul. Nakielska Street and St. The field crossroads were also designed with the widening of the roadway in the street. Field and surface replacement and construction of the side of the stone cube in ul. Nakielskaya. In addition, the project will build rainwater sewerage, lighting and reconstructing the teletechnical network. The built street will increase accessibility to newly created brownfield investment areas at Polna Street in Tarnowskie Góry.

Flag of Poland  Bytomski, Poland