Kohesio: discover EU projects in your region

project info
Start date: 4 May 2020
End date: 15 February 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 050 483,72 €
EU contribution: 892 911,16 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Śląskiego, Urząd Marszałkowski Województwa Śląskiego

Improvement of the energy efficiency of MOSiR’s Widowisko-Sports Hall and the stadium maintenance building in Czeladz, together with the installation of RES.

The subject of the project is the deep thermomodernisation of the building of the MOSiR Sports and Video Hall (Hala W-S) located at ul. Sports 2 and stadium building at ul. Sports 7 in Czeladz (BOS): a) Outside wall warming. (including replacement of facades in the part of Hall W-S made of sandwich panels), (b) warming of floors and ceilings of the arcades, c) partial reduction of window openings, d) replacement of door and window joinery, e) modernisation of heating systems with heat source, f) installation of mechanical ventilation with heat recovery (for the W-S Hall building), g) modernisation of the preparation system of hot water with installation of solar collectors, h) replacement of outdated lighting fixtures with new LEDs (for: Hall W-S). The project concerns two buildings with a total usable area of 4342.48 m², leading to an increase in energy efficiency by approx. 71,66 % and contributes to CO2 emission reductions from 422,363 t/year to 153,803 t/year, i.e. by 268,56 t/year (63.59 %).

Flag of Poland  Sosnowiecki, Poland