Kohesio: discover EU projects in your region

project info
Start date: 12 May 2020
End date: 20 November 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 11 853 310,65 €
EU contribution: 10 075 314,05 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podkarpackiego obsługiwany przez Urząd Marszałkowski Województwa Podkarpackiego w Rzeszowie, Departamenty odpowiedzialne za: zarządzanie, wdrażanie osi priorytetowych I-VI, obsługę finansową, kontrolę oraz wspomagające wdrażanie

Reconstruction/expansion of DW 895 on the section Solina – Myczków and DW 894 on the Hoczew – Polańczyk section – stage I

The main objective of the project is to improve the transport accessibility of the southern part of the Podkarpackie Voivodeship, in particular the Bieszczady National Park region, in road traffic. The implementation of the project will also help to improve communication between the Leskie district and the rest of the Podkarpackie Voivodeship, thereby increasing the level of accessibility and communication cohesion of the region. The object of the project is the reconstruction/expansion of Voivodship Road No 895 on the section Solina – Myczków from km 10+ 086.70 to km 16 + 215.51. The scope of the investment includes in particular: – reconstruction/extension of a section of the provincial road with a total length of 6.13 km, – extension/reconstruction of 2 intersections with minor roads together with the replacement of the surface of the minor roads within the intersections,- the extension of the bridge structure on the San River (most M1), the construction of a small bridge over the stream without a name (bridge M2), construction/reconstruction of 5 culverts,- construction and reconstruction of pavements,- reconstruction of four bus bays, extension of the bus bay (loop) including designation of the location of 3 bus stops – reconstruction of an existing parking lot,- reconstruction/construction of exits, – drainage of the road,- making security of landslides to the extent necessary,- strengthening the shores and bottoms of watercourses to the required extent,- strengthening the slopes,- rebuilding/protection of the network of armaments of the area conflicting with the rebuilt/extended regional road,- reconstruction/construction of street lighting,- construction of technological channel,- construction of environmental protection devices within the scope indicated in the environmental decision,- execution of vertical and horizontal markings and road safety devices.- construction/reconstruction of technical equipment of the road,- other works of a preparatory, auxiliary and orderly nature.Basic parameters of the road covered by this investment: road class: Z for reconstruction and G for extension, traffic category KR3, permissible load of vehicles – 115 kN/axle.

Flag of Poland  Krośnieński, Poland