Start date: 22 August 2016
End date: 31 March 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 16 444 197,58 €
EU contribution: 16 279 755,58 € (99%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski

Extension of the Voivodship road No 833 Chodel – Kraśnik from km 00+ 000 to km 26 + 679 with a length of 26.679 km – Stage I connection with the bypass of Chodla (voivodeship road No 747) and extension and translation of the road in Kraśnik.

The subject of the project is the extension of the voivodship road no. 833 – Stage I connection with the bypass of Chodla (Provincial Road No 747) and the extension and translation of the road in Kraśnik. Implementation of the investment will ensure the improvement of road safety, through the construction of pavements, pedestrian crossings, lighting, autobays, etc., improvement of environmental protection, rain drainage or drainage equipment. The main objective of the project is to increase external and intra-regional communication accessibility Lub. It’s a perimeter. Metropolit. by modernising the key roads of the province in connection with the network of national roads. The investment will therefore have a positive impact on all user groups benefiting from the road: transit traffic participants, local residents, investors and tourists. As a result of the implementation of the project, there will be an improvement in road traffic, reduced journey times to the destinations of travellers. It will allow heavy motor vehicles to move, which will serve the development of the surrounding towns and municipalities. The project will increase regional mobility by connecting secondary and tertiary nodes with national road infrastructure. Voivodship road No. 833 connects directly to the National Road No. 19 in Kraśnik, which strengthens and closes connections towards Lublin and Rzeszow. The load capacity of the road will increase to 11.5 tons per axle. The project, by liquefaction of traffic, will have a positive effect on reducing bottlenecks and bottlenecks in the places it crosses (in the town of Kraśnik and the municipality of Chodel). OUTPUT INDICATORS: Total length of rebuilt or upgraded roads (CI14) – 2,679 km; Length of reconstructed provincial roads – 2.679 km, Total length of new roads (Cl 13)/km – 6.578, length of construction. dr. Wojew./km – 6.578. Number of built/modernised environmental protection devices – 18 pcs, Number of built/modernised road safety devices – 126 pcs, length of the supported infrastr. bicycle. — 2,346 km.

Flag of Poland  Puławski, Poland