project info
Start date: 16 August 2017
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 13 005 191,00 €
EU contribution: 11 054 412,00 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski, Departament Rozwoju Regionalnego

Reconstruction and extension of provincial road No 254 Brzoza – Łabiszyn – Barcin – Mogilno – Wylatowo (Brzoza – Barcin section). Section I from km 0 + 069 to km 13 + 280.

The investment concerns reconstruction along with the extension of DW 254 Brzoza – Łabiszyn – Barcin – Mogilno – Wylatowo on the section Brzoza – Łabiszyn from km 0 + 069 to km 13 + 280. The analysed section DW 254 Brzoza – Łabiszyn is the first stage of the Brzoza – Barcin section indicated in the Kujawsko-Pomeranian Road and Rail Transport Cohesion Plan 2014-2020. The task is carried out in the formula “design and build”. The scope of activities includes, but is not limited to: reinforcement of the ground floor, reinforcement of the surface structure to load 115 kN/axle, construction of roundabouts, acoustic screens, renovation of existing culverts, renovation of existing bridges and footbridges, reconstruction and construction of intersections with change of geometry, correction of side inlets and new traffic organisation, reconstruction and construction of bus bays, sidewalks, construction of bicycle paths, construction/reconstruction of existing lighting and drainage, implementation of environmental protection – crossings for animals, protective and guiding fences and other resulting from environmental decision. The material scope of the investment confirms that the project will have a positive impact on safety on the roads of Kujawsko-Pomorskie Voivodeship by improving technical conditions and using BRD equipment. Main technical parameters of DW No 254:• road class Z (reconstruction) and G (construction and extension)• wide. — road section (lane width 2x3,0 m – 2x3.5m)• W. — the road section (2x3.5 m – 2x3.70m) • KR5 • the load of 115 kN/axis Investment will improve the link between the regional road network of Kujawsko-Pomorskie voivodship and the TEN-T (Motorway A1 via 25 and 10/S10). Implementation of the project within DW 254 will improve the alternative connection to national road 5 between the city of Bydgoszcz and Gniezno and Poznań (via DK15). In addition, the implementation of the project will also improve communication between Bydgoszcz – Łabiszyn – Barcin – Mogilno, including the Special Economic Zone in Barcin and the airport in Bydgoszcz.

Flag of Poland  Multiple locations, Poland