Reconstruction of an existing towing lock and an existing small lock through its partial demolition and construction in its place of a lock with parameters of 190 m in useful length and 12 m of usable width, together with the infrastructure and associated facilities at the “Januszkowice” water step. The scope of the tasks also includes modernisation of infrastructure and associated facilities at the water level, including upper and lower vanguards, relocation and construction of a new control room, the purchase of the necessary first equipment for the control facility and social rooms. The project’s tasks also include the regulation of the right bank of the Oder river below the weir and the outlet of the MEW at the Januszkowice water step, together with the implementation of a coast band and reconstruction of the dam from the lower water, and consequently improving the conditions for the use of flood waters.