The material scope of the project includes the construction of a waste sorting hall equipped with technological equipment for sorting waste from separate collection, located on the eastern wall of an already existing waste collection hall and sorting mixed waste at the Regional Municipal Waste Processing Plant in Suwałki. The construction of a new treatment plant for selectively collected waste is intended to ensure that more assortments of recovered raw material fractions from the separately collected municipal waste stream are obtained and thus reduce the amount of waste destined for landfilling. In the new facility, a new sorting line will be created for the treatment of raw material waste separately collected at a capacity of 5.000 Mg/year.