The material scope of the project includes the extension (upgrading) of the Municipal Waste Settlement Point (PSZOK) together with retrofitting. Main tasks of the project, including costs: — Modernisation and development of PSZOK with the necessary technical infrastructure and equipment Cost: PLN 2 182 108.00 net (i.e. PLN 2 683 279.84 gross, including VAT PLN 501 171.84) – TRANSPORT PRODUCTS Cost: PLN 645 718.00 net (i.e. PLN 794 233.14 gross, including VAT 148 515.14 PLN) PLN 33 714.00 net (i.e. PLN 33 714.00 gross, including VAT 0.00 PLN) – EXPENDITURE STUDIUM Cost: PLN 22 500.00 net (i.e. PLN 27 675.00 gross, including VAT PLN 5 175.00) – PROJECT REGULATION Cost: PLN 14 510.00 net (i.e. PLN 14 510.00 gross, including VAT 0,00 PLN) – PROMOTION OF PROJECT Cost: PLN 10 000.00 net (i.e. PLN 12 300.00 gross, including VAT PLN 2 300.00) Net costs are eligible expenditure. Thanks to the modernisation, PSZOK will carry out additional functions resulting from the assumptions of the waste hierarchy, i.e. collecting and transferring second-hand objects to subsequent users (without interfering with the useful features of the object). In addition, the PSZOK will be repaired and other actions will be carried out to restore/improve the performance of the items before they are handed over to the next users. PSZOK will also be equipped with infrastructure on the basis of which initiatives to raise public awareness of the correct management of waste will be carried out.