Start date: 28 May 2019
End date: 31 December 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 6 201 551,56 €
EU contribution: 3 601 938,59 € (58,08%)
programme
Programming period: 2014-2020
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
intervention field

Construction of the boiler room of the “Świt” Housing Cooperative in Ełk based on the production of heat energy from biomass combustion

The project includes the construction of a boiler room in Ełk based on the production of heat from biomass combustion. As part of the project, a new biomass boiler room will be built with installed water boiler fired with wood chips with a thermal output of 10.0 MW, together with a dry and condensing economiser, fuel storage and feeding system, exhaust gas discharge and ash removal and a complete technological and hydraulic installation. The boiler room will be located in a planned building built into the 3xWLM-2.5 boiler room.

Flag of Poland  Ełcki, Poland