THE PROJECT INVOLVES THE RECONSTRUCTION OF THE BRIDGE OVER THE EPTRACE RIVER WITH ANNEXED CHANGES TO THE SOUTH SIDE OF THE GIOIA TAURO STATION AND INSERTION OF THE BRIDGE INTO THE IS REMOTE CONTROL. THE OBJECTIVES ARE THE STRUCTURAL ADJUSTMENT AND ACCELERATION OF THE LINE.