IMPLEMENTATION OF THE HYDRAULIC ENGINEERING WORKS IN RIO SAN GIROLAMO — MASONE OLLASTU IN THE STRETCH BETWEEN THE MOUTH AND THE SS195. THE WORK IN QUESTION, WHICH IS TO BE CARRIED OUT AS A RESULT OF THE FLOODS OF 22/10/2008, CONSISTS OF THE HYDRAULIC ACCOMMODATION OF THE SAN GIROLAMO AND MASONE OLLASTU IN THE AREA BETWEEN THE MOUTH AND THE S.S. 195. THE TWO STRETCHES OF RIVER ARE RISAGOMEATI, INCREASING THEIR DISPOSAL CAPACITY. IN ADDITION, THE RIO SAN GIROLAMO Ê EXPELLED FROM THE BUILDINGS BUILT IN HIS SURROUNDINGS, AND THE DEPLOYMENT OF TWO BANKS ON THE RIGHT AND LEFT OF WATER WAS TAKEN, WHICH, BY FURTHER PROTECTING THE ADJACENT DWELLINGS, WILL MAKE IT POSSIBLE FOR THE TWO RIVERS TO HAVE A SMALL AREA OF CONTROLLED EXPANSION. IN ADDITION, ADDITIONAL WORKS ARE CARRIED OUT IN RELATION TO THE DISPLACEMENT OF WATER SUPPLY SYSTEMS TO THE RESERVOIR IN THE AREA, SEWAGE PLANTS, ELECTRICITY AND TELEPHONE LINES.