Start date: 1 December 2017
End date: 12 April 2021
Project website: link
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 9 840 000,00 €
EU contribution: 7 080 000,00 € (71,95%)
programme
Programming period: 2014-2020
Managing authority: Sergio Negro

COGENERATION — TRIGENERATION IN THE PO RUGGI AND COGENERATION — PHOTOVOLTAIC SYSTEM — THERMAL SHIELD — LED LAMPS (RELAMING) IN THE PLANT AT PROCIDA — AU S. GIOVANNI DI DIO AND GOD IN ARAGÓN

THE IMPACT OF THE OPERATION IS TWOFOLD, IN THE CASE OF A COGENERATION PLANT FOR COMBINED HEAT AND POWER PRODUCTION AND A TRIGENERATION PLANT FOR THE PRODUCTION OF ELECTRIC ENERGY AND HEAT, BOTH IN THE FORM OF HEAT AND CHILLED WATER. IN ADDITION TO THE COGENERATION PLANT, IN ADDITION TO THE COGENERATION PLANT, THE INTERVENTION SHOULD BE INTRODUCED ON THE BUILDING ENVELOPE THROUGH: THE THERMAL INSULATION OF THE WALLS, THE THERMAL INSULATION OF ROOF FLOORS, THE REMOVAL OF THERMAL BRIDGES, THE REPLACEMENT OF WINDOWS, THE SOLAI REVISION, ETC. FINALLY, IT ALSO PROVIDES FOR THE INSTALLATION OF A PHOTOVOLTAIC INSTALLATION AND THE REPLACEMENT OF THE WHOLE OF THE ILLUMINATING BODY FROM A LIGHTING SYSTEM WITH FLUORESCENT LAMPS TO A LIGHTING SYSTEM WITH LED LAMPS WITH ENERGY SAVINGS OF AROUND 60 %.

Flag of Italy  Province of Salerno, Italy