THE PROJECT PLANS TO REDUCE THE THERMAL DEMAND OF THE PROJECT, CONSISTING OF: MEASURES ON THE WRAPPING (THERMAL ENCLOSURE, REPLACEMENT OF THE FLAT/GLASS SYSTEM, INSULATION OF THE ROOF, INSULATION OF THE GROUND FLOOR, REALISATION OF THE THERMAL COATING OF THE STAIRWELLS) AND THE CONSTRUCTION OF AN ENERGY SAVING PLANT SYSTEM (REPLACEMENT REFRIGERATORS AND BOILER ROOM, REPLACEMENT OF SOLAR THERMAL AND CONSTRUCTION OF PHOTOVOLTAIC SYSTEMS, ADAPTATION OF THE ELECTRICITY SYSTEM AND USE OF LED LIGHTING SYSTEMS, INSTALLATION OF MANAGEMENT SYSTEMS).