THE PROPOSED PROJECT IS THE 3ND CONSTITUENT PART OF THE CONSTRUCTION OF THE SEWAGE SYSTEM AT THE SERVICE OF THE DISTRICT AND MUNICIPAL GATE: WITH THE OTHER TWO LOTS, DUE TO A LACK OF FINANCIAL COVER, THE OPERATION OF THE TREATMENT PLANT WAS PROVIDED FOR A NUMBER OF 600 INHABITANTS IN THE FACE OF THE PRESUMED TOTAL POPULATION OF 900 INHABITANTS AND OTHER SEWER SYSTEMS AT THE SERVICE OF THE VILLAGES OF THE PROJECT PROPOSED FOR FINANCING, ALLOWING THE CONNECTIONS TO THE EXISTING WATER TREATMENT PLANT TO BE CARRIED OUT.