THIS PROJECT CONSISTS OF A SERIES OF ACTIONS AIMED AT REDUCING THE HYDRAULIC HAZARD AND INCREASING THE SECURITY OF HOUSING AND INFRASTRUCTURE OF THE MUNICIPALITY OF SOLDA/MUNICIPALITY OF STELVIO. THE RIO VALLEY OF THE RIO VALLEY OF ZAI Ê CHARACTERISED BY HYDRAULIC WATER DANGER AREAS, RANGING FROM YELLOW (HAZARD LEVEL H2) TO RED (HAZARD LEVEL H4). THE PLANNED WORKS INCLUDE THE CONSTRUCTION OF 8 CONSOLIDATION SECRETARIES WITH A RIGHT BANK IN THE RIGHT BANK.\ NAS REGARDS THE ADJUSTMENT OF THE HYDRAULIC SECTION, THE CONOID VERTWILL HAVE TO BE RE-SYSTEMATISED. THIS WILL BE IN THE RANGE BETWEEN LAT ¿IROLLES AND LÂ’ HOTEL. IN PARTICULAR, IT SHALL BE ALIGNED WITH THE RIVO, WITH A VIEW TO DEEPENING AND TRANSFERRING THE LOWER COURSE OF THE COURSE, SO AS TO MAKE THE INTERVENTION MORE EFFECTIVE THAN THE INTERVENTION IN THE CASE OF FLOOD EXONDATION IN THE RIGHT HAND. THE FINAL SECTION OF THE COURSE IS CONSOLIDATED BY THE CONSTRUCTION OF A SURFACE OVERSTEP, AND THE RIGHT BANK WILL BE BACK TO THE RIGHT SIDE.