Kohesio: discover EU projects in your region

project info
Start date: 10 May 2017
End date: 3 June 2021
Project website: link
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 400 000,00 €
EU contribution: 700 000,00 € (50%)
programme
Programming period: 2014-2021
Managing authority: Ufficio per l'integrazione europea

PROTECTION AGAINST THE BRESSANONE — 1° LOT

THIS EXECUTIVE PROJECT TO REDUCE THE HYDRAULIC RISKS OF THIS ZONE PROVIDES FOR A SERIES OF INTERVENTIONS WITH THE AIM OF PROTECTING THE ZONE Â TOWARDS BRESSANONE AND THE SURROUNDING INFRASTRUCTURES. THIS AREA OVER TIME WAS INCLUDED AS THE MEDIUM RISK AREA — HIGH IN LINE WITH THE DANGER ZONE PLANS. IN ADDITION, THE AIM OF THE ÃO PROJECT IS TO AIM FOR ECOLOGICAL IMPROVEMENT AND TO CREATE A SENSE OF RECREATIONAL ZONE OVER THE RIVER. THIS SECTION OF THE BANK IS GOING TO BE SENT TO THE SOUTH TO THE FUTURE NEW BRIDGE Â TOWARDS THE FUTURE OF THIS ZONE. THIS BECOMES A LEISURE SECTION OF THE NEW BRIDGE TO BE CARRIED OUT WITH A NEW BRIDGE TO BE CARRIED OUT WITH A NEW BRIDGE TO BE CARRIED OUT WITH A TRANSLATION OF THE NEW BRIDGE Â BECOMES PART OF THIS PROJECT. THE BUILDING WILL BE BASED ON CURRENT TAILGATE WALLS. AT THE SOUTH OF THE BRIDGE, BANK WALLS UP TO THE SOUTH OF THE PROJECT WILL BE STEPPED UP.

Flag of Italy  Italy