The investment measurement covered by the project concerns the reconstruction of the approach track to Stepnica Port from pond 24 to the breakwater heads of the railway basin through a pair of ST1-ST2 basin basins with a rotor. The above-mentioned reconstruction will consist of changing the technical parameters of the access infrastructure to the Port of Stepnica. The objective of the investment is to enable ships to be operated by Stepnica Harbour up to 3.200 GT, with dimensions of 115 m long and 13.5 m wide, immersed from 3.8 m to 4.0 m. Considering the above, it is expected that technical parameters of the access infrastructure to the port will need to be achieved in the range below: — deepening of the approach track from pond 24 to the breakwater heads of the Railway Pool through a pair of basins ST1-ST2 to depth: 4.5 m and widening of this track – to approx. 40 m, – depth of the rotor to depth: 4.5 m and increase its diameter – to approx. 160 m. Length of modernised waterways as a result of the project – 4.5 km. Immediately after the completion of the project, it is possible to use the full functionality of the infrastructure and does not require additional activities (other projects, etc.) for its full use. The project in question is eligible for funding under ROP WZ 2014-2020, Action 5.7 for the following reasons: — consists of carrying out works on the waterway, which will contribute to increased accessibility of the region by water transport, especially in the area of Szczecin Metropolitan Area, – concerns two types of projects defined in the RPZP Competition Rules.05.07.00-IZ.00-32-001/17 – type 1: Construction, extension or upgrading of public navigable infrastructure, type 2: Improve the quality of waterways leading to ports along the Odrzańska Waterway and the Świnoujście-Szczecin waterway.