The project includes the creation of road infrastructure: the newly built section of the region. — Implementation stage 1: between the hives. Arkonska/Niemierzyńska to Łękno node approx. 490 m along with viaducts of roads and railways (WS-1, WK-2, WD-3), reconstruction of the section al. W. Polski between the intersection with ul. Prusa and Solski a street. Zaleski, approx. 0.6 km along with the construction of a communication junction. Łękno at the crossroads al. W. Polskiego z ul. A Traugutta; 2) tramway infrastructure.: redeveloped tram tram system. to odc. al. W. Polski between the intersection with ul. Prusa and Solski a street. Zaleski, approx. 0,6 km; 3) techn. inf.: reconstruction of the engineering network, i.e.: water supply networks., sewage (general, rain.), gas, electricity, teletechn.; 4) land use: construction of greenery and demolition of existing and construction of new buildings of small architecture and 5) elements of road traffic.