As part of the investment, there will be 3 integrated interchange hubs enabling the integration of all public transport modes available in the city with individual transport. Within each of the nodes, infrastructure will be built for the smooth functioning of each of them, including car parks: Park &ride and bike. The nodes will be connected by a bicycle path system. In order to increase the efficiency of public transport, interchange nodes and selected stops within the city will be covered by the Dynamic Passenger Information System. The investment will be carried out between 2017 and 2020.