The project includes the construction of the Skawina ring road within the Voivodeship Road No. 953 as a class G road, a one-way road with 2 lanes, with a length of approx. It’s 2,3 miles. The planned bypass is located in the municipality of Skawina. The beginning of the ring road will be incorporated into the outlet from the roundabout at the junction of the ring road with DK no. 44 approx. km 2200. End of the ring road roundabout at the junction with DW 953. The project is implemented in a design-built system, so the selected contractor is obliged to compile project documentation based on the functional-use programme together with obtaining a decision on permitting the implementation of the road project ZRID and all other administrative decisions, arrangements and opinions necessary to carry out the investment task and to carry out construction works.Characteristic parameters of the design road system: road class: G, movement category: KR 4, permissible surface loads: 115 kThe cross-section of the main road: width of the road: 7,0 m 2 x 3.5 m, width of the roadsides: 1,25 m or more, if the location of the BRD equipment is required, the width of the cycle path with the entry of pedestrians min. 3,0 m, the width of the belt between the cycle path and the roadway of min. 3,50 m, the slope of the slope and the counter-carpath not exceeding 1:1,5, the width of the trapezoidal ditch: min. 0,40 m parameters in the scope of intersection geometry: intersection with district road No. 1939K four-inlet roundabout, min. width of the roundabout: 5,0 m 2,0 m ring, intersection with Voivodeship Road No. 953, three-intake turbine roundabout with bypass towards Kalwaria Zebrzydowska; min. width of the roundabout: 5.0 m 2.0 m ring. Service routes: road class: D Trail width min. 3.0 m bypass, width of the side: 0.75 m or greater, if necessary to locate BRD devices.Due to the limited number of characters in field C.2.2. additional information is provided in point Q.