The project involves revitalising the area around 3 mineral water sources in Muszyn 1. The development of the land around the Grunwald drunken plant, on division no. 1961/1, 1961/2 will include: a) preparatory works (photo of humus layer from the belt of earthworks) and earthworks for shallow excavations (<1 m) medium (1?3m), deep (3 m;), preparation of land under embankments in accordance with PN-S-02205 Automotive roads. The earthworks. Requirements and tests; and construction of embankments, substructure made of broken aggregate mechanically stabilised, paving with paving b) construction of a single-storey structure, covered with a four-slope roof (incline angle 35o-45o) recreational arbour with a surface area. 17.25 m² and 50.0 m³ cubicle with two batteries standing to draw water. Collection point with cuboid shape 90x130 cm and height 80 cm c) mounting devices for children, el. small arch. and planting plants 2. Development of the space around the sources Anna per department. 770/5 for: assembling a gazebo of forged, galvanised steel, having: mid base approx. 500 cm and height. 450 cm. with one-sided entrance approx. It’s 230 centimeters. An eight-degree roof with an inclination of 32° made of flat steel sheet topped with a dome. A gazebo supported by 8 decorated pillars b) refurbishment of the mineral water collection point 3. The development of the area-Pijalnia Milusia, for division no. 731/9, 731/11 will include: a) modernisation of the area around the drinking room through the construction of hardenings from paving stones, renovation of the pavement of the road, assembly of small arch., levelling of the area, setting up a lawn and planting plants. Follow-up work: preparation of doc., investor supervision, promotion and management.