The subject of the project is the extension of the ZS in Kalinówka to include a teaching building and a gym designed in passive construction technology.The didactic building was designed with 3 floors with a cellar, a gymnasium – a building with 2 terrestrial floors. The total area of the designed construction is 1382.96 m², which together with the existing school facility (868.30 m²) constitutes an area of 2251.26 m². Both designed buildings will be fed into water by a designed water connection to the built-in segment of the school, the sewage will be drained by external installation. 31.05.2016r. The aim of the project is to improve the conditions of education contributing to the reduction of CO2 emissions by 51.98 % and to increase energy efficiency in the facilities of the Kalinówka School Team.The project envisages the employment of gender people, which is in the area covered by the project in a more difficult situation or people from marginalised groups. The object scope of the project consists of: feasibility study;technical documentation;land purchase;construction works – passive didactic building, geothermal pumps, photovoltaic installation 30 kW building.Dideactic,passive gymnastic room,passive gymnastics, installation of photovoltaic buildings.22.5 kW gymnastic hall, water/air pump assembly; project promotion;economy