Start date: 16 March 2016
End date: 31 December 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 040 922,45 €
EU contribution: 884 784,08 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski
intervention field
beneficiary

Installation of RES installations in Głusk commune

The subject of the project is the purchase and installation of solar heating systems of central water. Solar installations will be installed on 483 private buildings in the Głusk Municipality with a total capacity of 1803 kW. The project will also include 34 air-air heat pumps, 2 ground heat pumps with a total power of 102.70 kW and 4 furnaces per biomass with a total capacity of 100 kW. Existing conventional energy sources for C.W.U. will be replaced by free solar, aerothermal and biomass energy. Implementing the specific objectives will indirectly increase the tourist attractiveness of the region, improve the living conditions of its inhabitants and directly improve the state of the environment. The target group will be residents of the municipality of Głusk (private users), who expressed their willingness to join the project expressed in the form of a survey. Project indicators – additional renewable energy generation capacity – 2 MW. Thermal energy production – 1491,89 MWth/year. Number of units of heat generation – 523 pcs. Decrease in CO emissions 2-800.03 Mg/year.Air quality in the municipality is good; there is no obligation to develop an air protection programme. There are no corrective or short-term measures for the municipality of Głusk for the Lubelskie SEZ, which means that the levels of substances subject to air quality assessment have not been exceeded.

Flag of Poland  Lubelski, Poland