Kohesio: discover EU projects in your region

project info
Start date: 14 April 2016
End date: 31 July 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 467 090,50 €
EU contribution: 2 864 486,50 € (64,12%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Lubuskiego
© Creative Commons
© Creative Commons

Re ODRA – social and economic activation of post-factory sites in Nowa Sól

The project “RE-ODRA – social and economic activation of post-factory areas in Nowa Sól” is related to revitalisation of the industrial areas of the former Odra factory together with the immediate surroundings, as part of the tasks set out in the Local Programme for the Regeneration of the City of Nowa Sól for the years 2016-2023. As part of the task, it will be demolished, rebuilt and modernised, as well as an expanded tower building with adaptation to the function of social, economic and educational activation of entrepreneurs and residents of the revitalised area, which will constitute a characteristic dominant feature of the former factory. The above-mentioned function is possible after the construction of the technical infrastructure, which is currently in a catastrophic state. The investment therefore provides for the construction of new land armament networks (water, sewerage, lighting), reconstruction and removal of existing network collisions, solution to the problem of rainwater drainage, construction of approx. 150 parking spaces for cars, covered parking spaces for scooters and bicycles, reconstruction of the road pavement with the construction of a pedestrian system and the development of existing green areas (revalorisation of the park) together with the construction of a concert shell. The scope of the project includes: preparatory costs, construction works – assembly, construction supervision services, project promotion. The scope of construction works includes: 1) adaptation of the water tower to the Tower of Social and Economic Pressures through demolition and reconstruction and expansion of the facility with adaptation for disabled people (KK and KN); 2) reconstruction of devastated, post-factory technical infrastructure and construction of new infrastructure (KK); 3) construction of lighting)KK); 4) redevelopment of the Oracle Park and the development of green areas with the construction of concert shells (KK and KN); 5) creating a common public space in the heart of ODRA, building a square by an educational tower, culture and entertainment (KK and KN).

Flag of Poland  Zielonogórski, Poland