Kohesio: descoperiți proiectele UE din regiunea dumneavoastră

informații despre proiect
Data de începere: 1 ianuarie 2014
Data de încheiere: 30 decembrie 2023
finanțare
Fond: Fondul de coeziune (CF)
Buget total: 302 612 347,99 €
Contribuția UE: 257 220 495,80 € (85%)
program
Perioada de programare: 2014-2021
Autoritatea de management: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene

Constructia autostrazii Targu Mures - Ogra - Campia Turzii

The overall objective of this project is to achieve a fast and safe connection between the municipalities of Târgu Mures and Cluj by ensuring the continuity of 2B Câmpia Turzii - Cluj Napoca Vest (Gilau) motorway section with the sections 2A and 1C, and to relief the traffic congestion from the localities along the motorway. The main objectives of the project (construction of 51,796 km of 2x2 new motorway together with 4,7 km of 2x2 link road to Targu Mures, long - lasting development of transport sector, improving the traffic safety, reducing the environmental impact, reducing the number of accidents on the national road DN15, reducing the transit traffic, reducing the travel time) are in terms with LIOP 2014 - 2020, Priority Axis no. 1 - “Improving mobility by developing the TEN-T and subway network”, Thematic objective 7, Specific Objective 1.1 - "Increasing mobility on the central TEN-T road network”.

Flag of România  Multiple locations, România