Kohesio: descoperiți proiectele UE din regiunea dumneavoastră

informații despre proiect
Data de începere: 1 ianuarie 2016
Data de încheiere: 31 decembrie 2022
finanțare
Fond: Fondul de coeziune (CF)
Buget total: 295 978 982,40 €
Contribuția UE: 251 582 131,20 € (85%)
program
Perioada de programare: 2014-2020
Autoritatea de management: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene

METRO LINE 5: SECTION RAUL DOAMNEI – EROILOR (PS OPERA), INCLUDING VALEA IALOMITEI_Phase II

The main objective of the Project is to facilitate the connection between the western part of the city and downtown, by means of a metro transport line consisting of 6,871 km total length, 10 stations and 1 depot. The Metro Line 5 Project, Section Raul Doamnei – Eroilor (PS Opera), including Valea Ialomitei, is intended to provide a transport facility for over 64.000 passengers/day from the served area towards downtown, and also to provide a connection line with the existing metro line, at Eroilor station. The new line shall provide a transport facility by the metro at a commercial / maximum speed of 36/80km/h, at a minimum/average/proper headway of 1,5/3/6 minutes (90/180/360 seconds), on the section from Raul Doamnei to Eroilor, including Valea Ialomitei. The transport system improves the travel time on the served corridor from 32 minutes to 12 minutes and also shall enhance the commercial speed from 13 km/h to 36 km/h. The commissioning of Metro Line 5 boosts the overall user-friendliness of the metro system and implicitly, shall decrease the pressure on the public and private surface transport, which would also lead to reduced pollution (exhaust gas, noise, vibrations), fewer accidents, less wear of roads, with major implications including on the quality of life in terms of environmental conditions and general social-economic conditions (savings on fuel and maintenance, faster trips). The Project contributes to the promotion of a sustainable transport system in Romania which shall facilitate the safe, rapid and efficient transportation of passengers and goods, with a service level in line with the European standards, nationwide, Europe-wide and between various regions of Romania. Its objective is to boost the traffic of passenger and goods with an increased safety, speed and quality of services, including railway cross-operability, in light of the cohesion policy objective to develop secondary connections to TEN-T priority axes with the purpose of effectively approaching territorial cohesion across Europe, as well as across the regions of Romania. The Project is located in Romania, Bucharest (capital of the country), Districts 6, 5 and 1. The area served by the new metro line, Drumul Taberei Neighbourhood – Piaţa Operei, comprises a population of around 335.000 inhabitants. The new Metro Line 5 route, Section Raul Doamnei – Eroilor (PS Opera), including Valea Ialomitei follows the road territory of Drumul Taberei Avenue, from the junction with Raul Doamnei street, crossing the following roads: Valea Argesului, Valea Ialomitei, Romancierilor, Braşov, Sibiu, Vasile Milea, Drumul Sarii, Progresul, passing through Razoare intersection, enrolling on Prof. Dr. Dumitru Bagdasar street, close to Academia Militara, continuing on Eroilor Avenue through the intersection with Eroii Sanitari Avenue, having the bottom towards Operei Park after under crossing Dambovita River. The total cost of METRO LINE 5: SECTION RAUL DOAMN

Flag of România  România