DENNE AKTION VIL GENNEMFØRE DE FORANSTALTNINGER, DER INDGÅR I PROJEKTET TIL FORBEDRING AF KVALITETEN OG SIKRINGEN AF FORSYNINGEN TIL BYERNE I SIERRA SUR DE SEVILLA, SOM BESTÅR I AT UDVIKLE DET NØDVENDIGE ARBEJDE FOR AT SIKRE EN VANDFORSYNING AF HØJ KVALITET TIL BEFOLKNINGEN I SIERRA SUR DE SEVILLA. DE AKTIONER, DER SKAL GENNEMFØRES, ER OPDELT I TO HOVEDBLOKKE: 1) ECIJA#LA TURQUILLA-OSUNA AKSE FORBEDRING OG UDVIDELSE AF ECIJA PLAN KONSORTIETS HØJFORSYNINGSSYSTEM. UNDER OPFØRELSE: 1.1) NY 2050 KW PUMPESTATION (EBAP OSUNA I). 1.2) KØRELEDNING VED HJÆLP AF F.D. 800 MM I DIAMETER, FRA EBAP OSUNA I TIL DEN NYE PALOMAREJO REGULERINGSTANK PÅ 18.000 M3. 1.3) NYT PALOMAREJO LAGER PÅ 18.000 M3. 1.4) TYNGDEKRAFT RØR AF DEN NYE PALOMAREJO TANK OMGÅ TURQUILLA VED HJÆLP AF F.D. 700MM I DIAMETER. 1.5) TYNGDEKRAFTSRØR FRA TURQUILLA TIL EBAP OSUNA III VED HJÆLP AF F.D. 600 MM I DIAMETER. 1.6) AFLEDNING FRA EBAP OSUNA III TIL NY SIERRA SUR TANK VED HJÆLP AF F.D. 300 MM I DIAMETER. 1.7) NY SIERRA SUR DEPONERING PÅ 6.125 M³. 2) ARBEJDER AF FILIALEN AF TURQUILLA-SIERRA SUR. UNDER OPFØRELSE: 2.1) TYNGDEKRAFTSRØR FRA TURQUILLA TIL NYT RESERVOIR DEN HANE, DER ANVENDES F.D. 500 MM I DIAMETER. 2.2) NY TANK AF 8.400 M³ HANE. 2.3) NY EBAP DISTRIKT STEPPE PÅ 107,5 KW. 2.4) KØRELEDNING EBAPCOMARCA STEPPE TIL NYE RESERVOIR GENERELLE REGION STEPPE VED HJÆLP AF F.D. 500 MM I DIAMETER. 2.5) TYNGDEKRAFT BYPASS LEDNING FRA DEN NYE RESERVOIR GENERELLE REGION STEPPE TIL DEN NYE RESERVOIR STRUT, TIL FORSYNING TIL STEPPE, LORA DE STEPPA, CASARICHE, BADOLATOSA, PRUNA OG RODA DE ANDALUCÍA, VED HJÆLP AF F.D. 250/200 MM I DIAMETER. 2.6) TYNGDEKRAFT BYPASS LEDNING FRA DEN NYE GENERELLE RESERVOIR AF STEPPE TIL PEDRERA-GILENA OG TILSLUTNING TIL EKSISTERENDE LEDNING AF AGUADULCE I PEDRERA TIL LEVERING TIL GILENA, PEDRERA OG AGUADULCE, VED HJÆLP AF F.D. 200 MM I DIAMETER.