Et officielt EU-websiteOfficielt EU-website

Kohesio: Find EU-projekter i din region

projektoplysninger
Startdato: 28 februar 2019
Slutdato: 27 maj 2020
finansiering
Fond: Den Europæiske Fond for Regionaludvikling (ERDF)
Samlet budget: 955 704,38 €
EU-bidrag: 812 348,73 € (85%)

Forbedring af energieffektiviteten i bygningen ved Mazā Lubānas iela 11, Riga

Formålet med projektet er at fremme forbedring af energieffektiviteten i bygningen af Letlands universitet, Mazā Lubānas iela 11, Riga.1) de planlagte termiske energibesparelser efter projektets gennemførelse er ikke mindre end 294,63 MWh/år (40,27 %/år); 2) det planlagte varmeforbrug til opvarmning efter projektets gennemførelse vil ikke overstige 51,18 kWh/m² pr. år3) planlagt reduktion af CO2-emissioner 87 024 kg/år; Projekt samlede støtteberettigede omkostninger 955 704,38 EUR, inkl. støtte fra Den Europæiske Fond for Regionaludvikling 85 % eller 821 348,72 EUR og statsbudgetmidler 15 % eller 1 433 355,66 EUR.I overensstemmelse med energisyn og teknisk eftersyn af bygningen er det planlagt at gennemføre følgende foranstaltninger til forbedring af energieffektiviteten i building:1.Based konstruktioner:-Insulation af facaden ved hjælp af husets tilgang; — Udskiftning af interlock fyldninger;- Isolering af mursten paladser; —Isolering af vinduerne udefra langs omkredsen, herunder under vindueskarmene (hvor det er fysisk muligt);-Veco kældervinduer udskiftning med PVC-vinduer med en glaspakke med selektiv. Replacement of old doors against fireproof insulated metal doors;-Cokola insulation;-Jump insulation;- Dismantling of balconies that will prevent their connection to thermal bridges.2.Hot water system:-Installation of solar collectors for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Installed shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water production (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Instalating shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage 15 months from the signing of the agreement on project implementation.

Flag of Letland  Riga, Letland