project info
Start date: 30 May 2016
End date: 29 December 2020
funding
Fund: n/a
Total budget: 259 128 662,11 €
EU contribution: 168 977 800,56 € (65,21%)
programme
Programming period: 2014-2020
Managing authority: NFM Közlekedési Operatív Programokért Felelős Helyettes Államtitkárság

M35 motorway No. 4 — Main road 481, main road 481 — Berettyóújfalu section and implementation of main road 481

The section of the M35 motorway No. 4 — Berettyóújfalu, along with the section of the M4 motorway between Berettyóújfalu — Nagyköri (Oh.) connecting the Baltic Sea to the Black Sea as part of the Trans-European Network-Transport (TEN-T) network. Lancuti line) within the long-term expressway line — among others — the Košice — Debrecen-Oradea expressway connection will also be provided. The North Transylvania motorway is also connected to the express road network in Hungary by means of the two motorway sections referred to. M35 Motorway Phase I: between the sections 43+ 620-49+ 050 (main road 4 — main road 481), 5.43 km long. Municipalities concerned: Debrecen, Ebes. Cross-sectional design: 2x2 lane highway with stop lane and middle separator lane with a crown width of 26.60 m. M35 Motorway Phase II: between the sections 49+ 050-67+ 790 km (481 — Berettyóújfalu), 18.74 km length. Cross-sectional design: 2x2 lane highway with stop lane and middle separator lane with a crown width of 26.60 m. A separate level road junction is built at the junction of the M35 motorway and the road 4816 j. Construction of 1 simple (Mikepércs) and 1 complex (Derecske) rest area. M4 motorway: between 1+ 025-2+ 550 km sections, 1.525 km long. Cross-sectional design: 2x2 lane highway with stop lane and middle separator lane with a crown width of 26.60 m. An indirect branch of 800 m long between the M35 motorway and the M4 motorway is built. Main road 481: between the M35 motorway and main road No 47, length: 5.5 km, cross-sectional design: Highway 2x1 lane. Crown width 12.00 m, width of traffic lanes 3.50 m, bench width 2.50 m. 4 803 m. j. Ground-Derecske e. road: construction with solid pavement between the 6+ 650-9+ 238 km sections, which takes place in 2.588 km length. Cross-sectional design: 2x1 lane connecting road with a crown width of 9.50 m. This section includes the following separate levels of road nodes: — Highway M35 — Main Road 4 (Debrecen), — Highway M35 — Main Road No 481 (Debrecen), — M35 motorway — Road 4816 j. road junction (Derecske). The section includes the replacement and protection of all relevant public utilities, the correction of the national and local roads affected by the crossing, the construction of a parallel service road network ensuring access to real estate, the construction of a simple and complex resting place. As part of the investment, the main road No 481 will be built, which will establish a road link between the M35 motorway and the main road no. 47 in the administrative area of Debrecen. The M4 motorway will be built on the section between the 1+ 025-2+ 550 km sections, and the construction of the 4803.j. Földes-Derecske ec. road with solid pavement between the 6+ 650-9+ 238 km sections will be completed. 19 bridge artworks will be built on the section. Tasks to be carried out during the preparation of the phase: — area insurance, demunition, preventive archaeological excavation. Tasks to be carried out during the execution of the section: — M35 motorway No. 4 — Construction and technical inspection of the section between Berettyóújfalu (Berettyóújfalu), — carrying out entry into service procedures, — carrying out supplementary expropriation procedures, obtaining land conversion permits and carrying out a transfer to the land register.

Flag of Hungary  Hungary