Kohesio: discover EU projects in your region

project info
Start date: 1 January 2021
End date: 28 December 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 389 536 819,20 €
EU contribution: 331 106 304,00 € (85%)
programme
Programming period: 2014-2020
Managing authority: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene
beneficiary

Regional project for the development of water and wastewater infrastructure in Iasi County, between 2014 and 2020

The general objective of the project is to improve the water and sewerage infrastructure in the localities of Iași county included in the project, in order to fulfil the obligations established by the Accession Treaty and the relevant European Directives. Through the project, the following indicators set out in the LIOP will be achieved by 2023: CO18 = 191.292 inhabitants; Given that in 2018 the water supply service of the localities supplied with water on the Sabaoani-Braesti route was interrupted for a period of 105 days for a population of 148,968 inhabitants, which is contrary to the provisions of the delegation agreement, it can be considered that the entire population does not comply with one of the requirements of European Directive 98/83/EC, namely ensuring continuity of water supply 24/7. To these are added the other inhabitants affected by a poor water quality or those affected by frequent interruptions of the service due to damage, problems that will be solved by the investments provided for in this project. CO19 = 77.188 equivalent inhabitants. Through these indicators, the project will contribute to the achievement of LIOP objectives, OS 3.2, as well as to compliance with European directives, as follows: The degree of connection, before the project, to the water supply system, in the project area, is 78.07 % – 489,784 inhabitants (year 2023), of which 53.61 % – 336,287 inhabitants (year 2023), supplied with quality water complying with Directive 98/83/EC). 2S33 – After investments in LIOP, the degree of connection and compliance in the project area will increase to 84.10-527.579 inhabitants in 2023. The percentage will increase to 100 % in the future through investments from other financing sources. The level of compliance, prior to the project, of biodegradable organic load (in l.e.) to collecting systems in agglomerations in the project coverage area is 64.73 % – 407,368 l.e. (year 2023). After the implementation of the Project, the compliance level will reach 77.00 % – 484,556 l.e. (year 2023). The percentage will increase in the future to 98 % – 100 % through investments from other financing sources. 2S31 – The degree of connection of biodegradable organic load to collection systems in agglomerations with more than 10000 l.e. will increase from 76.4 % (400,098 L.E.) in 2023 to 82.9 %, after completion of the project in 2023, reaching 434,236 L.E. and 34.138 L.E. 2S32 – The degree of connection of biodegradable organic load to collection systems in agglomerations with 2000-10000 l.e. will increase from 12.7 % in 2023 (13,440 L.E.), at 47.7 % after completion of the project in 2023, reaching 50,320 L.E. and 36.879 L.E. 2S29 – no investments were foreseen for treatment plants, serving agglomerations with more than 10,000 L.E. 2S30 – investments were foreseen to achieve 4 new compliant SEAUs and 1 Rehabilitated SEAU compliant (demolition and construction of a new station) serving 7 agglomerations (out of 29 agglomerations)

Flag of Romania  Multiple locations, Romania