Start date: 1 January 2015
End date: 31 December 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 671 393 000,00 €
EU contribution: 468 516 350,00 € (69,78%)
programme
Programming period: 2014-2020
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
beneficiary

Construction of the second metro line with the purchase of rolling stock – stage III

The project is located in the area of W-wy, Mazowieckie Voivodeship in districts: Will and Bemowo (Western), Targówek (East-North). The project is located on one of the city’s main communication routes, connecting the centre with a cluster of jobs and housing estates. The Project consists of: Subproject A – extension of the second metro line by 2 stations in the western direction and 3 stations in east-north direction, Subproject B – purchase of 17 units of rolling stock. As part of the implementation of the western section, the following will be carried out: — 2 stations: C5 – which will be located under the street. Górczewska in the area of the shopping centre, C4, which will be located under ul. Górczewska, in the area of the intersection with ul. The Silesian insurgents, in the vicinity of the Bemowo District Town Hall, along with the staging tracks. — Trail vector: V5. — 2 tunnels: D6, D5. — dismantling chamber at the base tracks of the station C6. As part of the implementation of the Eastern-North section, the following will be carried out: — 3 stations: C19, which will be located in the center of the settlement Zacisze, under ul. Figara, on the south side of the intersection with ul. Roland, C20, which will be located under the street. Kondratowicza in the area of the intersection with ul. Malborska, in the vicinity of Targówek Town Hall, C21, which will be located under ul. Kondratowicza in the area of the intersection with ul. It’s a Rembielina. — 3 trail fans: V19, V20, V21. — 3 tunnels: D19, D20, D21. — dismantling chambers at the stations being built. Product indicator material progress – the total length of new or upgraded tram lines and metro lines: 2019-2021-0 km, 2022-6 km. Rolling stock will be purchased – 17 units for operation of metro lines I and II (complementation of MW inventory and replacement of 81 series rolling stock), spare parts, stations, tools and software for operation, service and diagnostics of trains. Physical progress of the product index i.e. number of units purchased of passenger rolling stock (...): 2017-2021-0, 2022-17.

Flag of Poland  Miasto Warszawa, Poland