The project will be carried out in the areas of Kielce and jjrzejowski districts (Świętokrzyskie voivodeship) and includes: — construction of an expressway with a cross section of 2x2 and a length of 21,553 km; — construction of three road junctions (“Tokarnia”, “Brzegi” “Mnichów”), two Travel Service Facilities (“Smyków”, “Podlesie”) and Vehicle Control Sites “Wrzosy”; — the necessary construction and reconstruction of engineering facilities, roads, walking and roadways, acoustic screens, animal crossings, road culverts, rainwater drainage system, lighting, conflicting equipment, BRD equipment; — demolition and demolition of buildings and buildings, – planting greenery.