Start date: 16 May 2018
End date: 16 July 2020
funding
Fund: Cohesion Fund (CF)
Total budget: 11 638 605,00 €
EU contribution: 9 892 815,00 € (85%)
programme
Programming period: 2014-2020
Managing authority: Ministerstvo dopravy - Odbor fondů EU
intervention field
European Commission Topic
European Commission Topic

Reconstruction of switches under St. 5 in the railway station. Brno hl.n.

The construction is located at the railway station Brno hl.n. in the intravilan of the city of Brno, in the cadastral City of Brno and Staré Brno, on km 142.600-143.350. The line is electrified by AC traction system 25 kV, 50 Hz. The current line speed is 30 km/h in the entire circumference with the exception of tracks 1, 2, 4, where the line speed for passenger trains is 40 km/h from the beginning of the section to km 143.079. The line load class is C3, the Z-GČD gauge. The line speed will not be increased with regard to directional conditions.

Flag of Czechia  Prague, Czechia