GRANADILLA CENTRAL EOLICO PARK OF RATED POWER 16.1 MW, CONSISTING OF 7 ENERCON E70 WIND TURBINES OF 2,300 KW EACH AND 98M OF BUSHING HEIGHT. _x000D_ the AEROGENERATORS AND THE COMMUNITY CENTER AND CONTROL OF THE EOLICAL PARK will be located within the RECINTE OF GRANADILLA TERMICAL CENTRAL, MIENTRAS THAT THE MEDIA LINE OF THE EVACUATION LINE DISCURRIED by margins of VIALAL AND COMMUNAL ZONAS OF GRANADILLA INDUSTRIAL POLIGONO, it HAS THE LOCATION OF THE ELECTRICA SE ITER substation, within the MUNICIPAL TERMINO DE GRANADILLA DE ABONA.