Developing a sustainable flood management in the most vulnerable area in Prut-Barlad b.h. by significantly reducing the flood risk incident (82 % in Bahlui and Bahluet b.h. and 9.2 % in Prut-Barlad b.h.) following the development of structural and non-structural measures.