The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished.