{"list":[{"link":"https://linkedopendata.eu/entity/Q7417504","item":"Q7417504","snippet":[],"labels":["Section 3 of the Sibiu–Pitești Motorway (A1)"],"originalLabels":["Highway Sibiu - Pitesti (section 3)"],"descriptions":["<p>The&nbsp;project&nbsp;will&nbsp;implement&nbsp;the&nbsp;third&nbsp;section&nbsp;of&nbsp;the&nbsp;Sibiu&nbsp;–&nbsp;Pitești&nbsp;Motorway&nbsp;(A1)&nbsp;between&nbsp;the&nbsp;localities&nbsp;of&nbsp;Cornetu&nbsp;and&nbsp;Tigveni&nbsp;(Vâlcea&nbsp;and&nbsp;Argeș&nbsp;counties),&nbsp;which&nbsp;will&nbsp;have&nbsp;a&nbsp;length&nbsp;of&nbsp;37.4&nbsp;km&nbsp;and&nbsp;will&nbsp;include&nbsp;52&nbsp;bridges,&nbsp;one&nbsp;ecoduct,&nbsp;one&nbsp;tunnel,&nbsp;two&nbsp;interchanges,&nbsp;two&nbsp;service&nbsp;areas,&nbsp;and&nbsp;a&nbsp;maintenance&nbsp;and&nbsp;coordination&nbsp;center.&nbsp;</p><p></p><p>The&nbsp;main&nbsp;beneficiaries&nbsp;of&nbsp;this&nbsp;project&nbsp;are:&nbsp;users&nbsp;of&nbsp;the&nbsp;transport&nbsp;network&nbsp;(drivers&nbsp;and&nbsp;transport&nbsp;operators),&nbsp;as&nbsp;well&nbsp;as&nbsp;local&nbsp;communities.&nbsp;</p><p></p><p>The&nbsp;segment&nbsp;targeted&nbsp;by&nbsp;this&nbsp;contract&nbsp;is&nbsp;part&nbsp;of&nbsp;the&nbsp;strategically&nbsp;important&nbsp;Sibiu-Pitești&nbsp;Highway&nbsp;project,&nbsp;part&nbsp;of&nbsp;the&nbsp;TEN-T&nbsp;Core&nbsp;network,&nbsp;which&nbsp;will&nbsp;complete&nbsp;the&nbsp;Rhine-Danube&nbsp;corridor,&nbsp;providing&nbsp;a&nbsp;fast&nbsp;and&nbsp;safe&nbsp;connection&nbsp;between&nbsp;the&nbsp;western&nbsp;border&nbsp;with&nbsp;Hungary&nbsp;and&nbsp;the&nbsp;port&nbsp;of&nbsp;Constanța.&nbsp;The&nbsp;completion&nbsp;of&nbsp;the&nbsp;entire&nbsp;highway&nbsp;will&nbsp;reduce&nbsp;travel&nbsp;time,&nbsp;improve&nbsp;road&nbsp;safety,&nbsp;and&nbsp;modernize&nbsp;the&nbsp;transport&nbsp;infrastructure.&nbsp;</p><p></p><p>Currently,&nbsp;traffic&nbsp;between&nbsp;Sibiu&nbsp;and&nbsp;Pitești&nbsp;takes&nbsp;place&nbsp;on&nbsp;DN7,&nbsp;a&nbsp;crowded&nbsp;and&nbsp;dangerous&nbsp;route&nbsp;that&nbsp;causes&nbsp;frequent&nbsp;delays&nbsp;and&nbsp;has&nbsp;a&nbsp;low&nbsp;average&nbsp;speed&nbsp;(60&nbsp;km/h).&nbsp;Between&nbsp;2012&nbsp;and&nbsp;2018,&nbsp;road&nbsp;accidents&nbsp;on&nbsp;DN7&nbsp;increased&nbsp;by&nbsp;40%,&nbsp;making&nbsp;this&nbsp;road&nbsp;dangerous&nbsp;and&nbsp;inefficient&nbsp;for&nbsp;both&nbsp;passenger&nbsp;and&nbsp;freight&nbsp;transport.&nbsp;</p><p></p><p>To&nbsp;address&nbsp;these&nbsp;issues,&nbsp;the&nbsp;Sibiu-Pitești&nbsp;highway&nbsp;will&nbsp;provide&nbsp;a&nbsp;fast&nbsp;and&nbsp;safe&nbsp;route,&nbsp;uninterrupted,&nbsp;between&nbsp;Sibiu&nbsp;and&nbsp;Pitești,&nbsp;crossing&nbsp;the&nbsp;counties&nbsp;of&nbsp;Sibiu,&nbsp;Vâlcea,&nbsp;and&nbsp;Argeș.&nbsp;The&nbsp;route&nbsp;will&nbsp;include&nbsp;cities&nbsp;and&nbsp;localities&nbsp;such&nbsp;as:&nbsp;Șelimbăr,&nbsp;Tălmaciu,&nbsp;Turnu&nbsp;Roșu;&nbsp;Câineni,&nbsp;Racovița,&nbsp;Perișani;&nbsp;Sălătrucu,&nbsp;Șuici,&nbsp;Cepari,&nbsp;Tigveni,&nbsp;Curtea&nbsp;de&nbsp;Argeș,&nbsp;Băiculești,&nbsp;Merișani,&nbsp;Budeasa,&nbsp;and&nbsp;Bascov.&nbsp;The&nbsp;project&nbsp;is&nbsp;divided&nbsp;into&nbsp;five&nbsp;sections:</p><p>•&nbsp;Sibiu-Boița&nbsp;(13.17&nbsp;km)</p><p>•&nbsp;Boița-Cornetu&nbsp;(31.33&nbsp;km)</p><p>•&nbsp;Cornetu-Tigveni&nbsp;(37.40&nbsp;km)</p><p>•&nbsp;Tigveni-Curtea&nbsp;de&nbsp;Argeș&nbsp;(9.86&nbsp;km)</p><p>•&nbsp;Curtea&nbsp;de&nbsp;Argeș-Pitești&nbsp;(30.35&nbsp;km)&nbsp;</p><p></p><p>Main&nbsp;benefits&nbsp;include:</p><p>•&nbsp;Reduced&nbsp;travel&nbsp;time&nbsp;and&nbsp;increased&nbsp;safety:&nbsp;Provides&nbsp;modern&nbsp;infrastructure&nbsp;for&nbsp;passengers&nbsp;and&nbsp;transporters.</p><p>•&nbsp;Strategic&nbsp;connections:&nbsp;Creates&nbsp;a&nbsp;continuous&nbsp;corridor&nbsp;between&nbsp;Western&nbsp;Europe&nbsp;and&nbsp;the&nbsp;Black&nbsp;Sea,&nbsp;facilitating&nbsp;international&nbsp;trade.</p><p>•&nbsp;Economic&nbsp;development:&nbsp;Stimulates&nbsp;investments,&nbsp;creates&nbsp;jobs,&nbsp;and&nbsp;supports&nbsp;local&nbsp;businesses&nbsp;and&nbsp;tourism.</p><p>•&nbsp;Pollution&nbsp;and&nbsp;congestion&nbsp;reduction:&nbsp;Eases&nbsp;heavy&nbsp;traffic&nbsp;on&nbsp;DN7,&nbsp;bringing&nbsp;direct&nbsp;environmental&nbsp;and&nbsp;health&nbsp;benefits&nbsp;for&nbsp;communities.&nbsp;</p><p></p><p>The&nbsp;construction&nbsp;of&nbsp;the&nbsp;highway&nbsp;will&nbsp;modernize&nbsp;Romania’s&nbsp;transport&nbsp;network,&nbsp;reducing&nbsp;congestion,&nbsp;travel&nbsp;time,&nbsp;and&nbsp;the&nbsp;risk&nbsp;of&nbsp;accidents.&nbsp;This&nbsp;project&nbsp;will&nbsp;have&nbsp;a&nbsp;major&nbsp;impact&nbsp;on&nbsp;the&nbsp;national&nbsp;economy,&nbsp;facilitating&nbsp;freight&nbsp;transport&nbsp;and&nbsp;improving&nbsp;the&nbsp;country’s&nbsp;connection&nbsp;to&nbsp;the&nbsp;European&nbsp;network.</p><p></p><p>More&nbsp;info&nbsp;at:<a href=\" https://fonduri.mt.ro/programul-transport-pt-2021-2027/proiectele-pt/autostrada-sibiu-pitesti-sectiunea-3-cornetu-tigveni  \" rel=\"noopener noreferrer\" target=\"_blank\">&nbsp;https://fonduri.mt.ro/programul-transport-pt-2021-2027/proiectele-pt/autostrada-sibiu-pitesti-sectiunea-3-cornetu-tigveni&nbsp;&nbsp;</a></p><p>You&nbsp;can&nbsp;also&nbsp;find&nbsp;more&nbsp;information&nbsp;on&nbsp;the&nbsp;beneficiary’s&nbsp;dedicated&nbsp;project&nbsp;page:&nbsp;<a href=\"https://www.cnadnr.ro/ro/proiecte/autostrada-sibiu-pite%C8%99ti-sec%C8%9Biunea-3 \" rel=\"noopener noreferrer\" target=\"_blank\">https://www.cnadnr.ro/ro/proiecte/autostrada-sibiu-pite%C8%99ti-sec%C8%9Biunea-3&nbsp;</a></p>"],"originalDescriptions":["The general objective of the Sibiu-Pitesti motorway, as defined in the MPGT, is to improve the economic efficiency of Romanian transport, by improving the travel time between Sibiu and Pitesti and implicitly improving connectivity at regional level. The objective of the corridor is to provide direct access to the Black Sea through a unified motorway profile as well as to other countries through border connections. The new motorway is the first to cross the Carpathian Mountains and will bring significant development opportunities for all communities from the north to the south of Romania. Thus, the project aims to provide an appropriate mix of ‘high-quality road’ infrastructure, as part of the national infrastructure network, to accommodate long-distance freight and passenger traffic, as well as local traffic specific to the metropolitan area, while ensuring an adequate level of traffic safety and security."],"startTimes":["2022-08-05"],"endTimes":["2027-12-31"],"euBudgets":["562542263,05"],"totalBudgets":["1406355657,63"],"images":["https://kohesio.ec.europa.eu/images/d24b118b-673d-4ce0-b5aa-a04d522afb25.jpg"],"copyrightImages":["© © © CNADR"],"coordinates":["24.1538719,45.0404536","24.8488685,44.9939764"],"objectiveIds":["PO03"],"countrycode":["RO"]},{"link":"https://linkedopendata.eu/entity/Q3095626","item":"Q3095626","snippet":[],"labels":["Integrated infrastructure for the orbital area of Bucharest changed"],"originalLabels":["Integrated infrastructure for the orbital area of Bucharest"],"descriptions":["<p>Enhancing&nbsp;mobility&nbsp;and&nbsp;connectivity&nbsp;through&nbsp;the&nbsp;development&nbsp;and&nbsp;modernisation&nbsp;of&nbsp;Bucharest&#39;s&nbsp;ring&nbsp;road&nbsp;infrastructure.</p><p></p><p>The&nbsp;&quot;Integrated&nbsp;Infrastructure&nbsp;for&nbsp;the&nbsp;Orbital&nbsp;Area&nbsp;of&nbsp;Bucharest&quot;&nbsp;project&nbsp;addresses&nbsp;the&nbsp;need&nbsp;for&nbsp;improved&nbsp;mobility&nbsp;and&nbsp;connectivity&nbsp;in&nbsp;the&nbsp;Bucharest&nbsp;metropolitan&nbsp;area.&nbsp;Bucharest,&nbsp;the&nbsp;capital&nbsp;city&nbsp;of&nbsp;Romania,&nbsp;faces&nbsp;significant&nbsp;traffic&nbsp;congestion&nbsp;and&nbsp;accessibility&nbsp;challenges&nbsp;due&nbsp;to&nbsp;its&nbsp;expanding&nbsp;population&nbsp;and&nbsp;economic&nbsp;activities.&nbsp;The&nbsp;project&nbsp;focuses&nbsp;on&nbsp;developing&nbsp;and&nbsp;modernising&nbsp;essential&nbsp;road&nbsp;infrastructure,&nbsp;with&nbsp;an&nbsp;emphasis&nbsp;on&nbsp;enhancing&nbsp;mobility&nbsp;on&nbsp;the&nbsp;central&nbsp;Trans-European&nbsp;Transport&nbsp;Network&nbsp;(TEN-T)&nbsp;road&nbsp;network.&nbsp;The&nbsp;objective&nbsp;is&nbsp;to&nbsp;facilitate&nbsp;better&nbsp;interconnectivity&nbsp;between&nbsp;national&nbsp;roads,&nbsp;motorways,&nbsp;and&nbsp;Bucharest&#39;s&nbsp;local&nbsp;road&nbsp;network,&nbsp;ultimately&nbsp;improving&nbsp;traffic&nbsp;safety&nbsp;and&nbsp;access&nbsp;to&nbsp;the&nbsp;city.</p><p></p><p>Objectives:</p><ul><li>Construct&nbsp;the&nbsp;Southern&nbsp;Sector&nbsp;of&nbsp;the&nbsp;Bucharest&nbsp;Bypass&nbsp;Motorway,&nbsp;including&nbsp;new&nbsp;motorway&nbsp;sections&nbsp;and&nbsp;supporting&nbsp;infrastructure.</li><li>Modernise&nbsp;existing&nbsp;sections&nbsp;of&nbsp;the&nbsp;Bucharest&nbsp;Ring&nbsp;Road&nbsp;for&nbsp;enhanced&nbsp;capacity&nbsp;and&nbsp;safety.</li><li>Improve&nbsp;traffic&nbsp;flow&nbsp;and&nbsp;intersection&nbsp;functionality&nbsp;at&nbsp;key&nbsp;junctions&nbsp;such&nbsp;as&nbsp;Domnești,&nbsp;Oltenița,&nbsp;Berceni,&nbsp;and&nbsp;Mogoșoaia.</li><li>Increase&nbsp;accessibility&nbsp;to&nbsp;the&nbsp;TEN-T&nbsp;network&nbsp;from&nbsp;local&nbsp;roads&nbsp;and&nbsp;Bucharest.</li><li>Enhance&nbsp;traffic&nbsp;safety&nbsp;conditions.</li></ul><p></p><p>Key&nbsp;Features&nbsp;and&nbsp;Activities:</p><ul><li>Construction&nbsp;of&nbsp;51.195&nbsp;km&nbsp;of&nbsp;new&nbsp;motorway&nbsp;for&nbsp;the&nbsp;Bucharest&nbsp;Bypass&nbsp;Motorway.</li><li>Modernisation&nbsp;of&nbsp;20.274&nbsp;km&nbsp;of&nbsp;the&nbsp;existing&nbsp;Bucharest&nbsp;Ring&nbsp;Road,&nbsp;incorporating&nbsp;new&nbsp;bridges,&nbsp;overpasses,&nbsp;and&nbsp;parking&nbsp;areas.</li><li>Development&nbsp;of&nbsp;advanced&nbsp;intersection&nbsp;structures&nbsp;including&nbsp;level&nbsp;roundabouts&nbsp;and&nbsp;collecting&nbsp;roads.</li><li>Widening&nbsp;of&nbsp;specific&nbsp;road&nbsp;sections&nbsp;for&nbsp;improved&nbsp;traffic&nbsp;capacity.</li><li>Establishment&nbsp;of&nbsp;maintenance&nbsp;centres&nbsp;and&nbsp;service&nbsp;areas&nbsp;to&nbsp;support&nbsp;traffic&nbsp;operations.</li></ul><p></p><p>Target&nbsp;Audience:</p><ul><li>Citizens&nbsp;of&nbsp;Bucharest&nbsp;and&nbsp;neighbouring&nbsp;regions</li><li>Local&nbsp;and&nbsp;national&nbsp;commuters</li><li>Transport&nbsp;and&nbsp;logistics&nbsp;companies</li><li>Public&nbsp;authorities&nbsp;overseeing&nbsp;infrastructure&nbsp;management</li></ul><p></p><p>Impact:</p><ul><li>Improved&nbsp;traffic&nbsp;flow&nbsp;and&nbsp;reduced&nbsp;congestion&nbsp;within&nbsp;Bucharest&nbsp;and&nbsp;its&nbsp;orbital&nbsp;area.</li><li>Enhanced&nbsp;economic&nbsp;activity&nbsp;through&nbsp;better&nbsp;accessibility&nbsp;and&nbsp;connectivity.</li><li>Increased&nbsp;safety&nbsp;and&nbsp;reduced&nbsp;travel&nbsp;times,&nbsp;fostering&nbsp;social&nbsp;and&nbsp;economic&nbsp;benefits.</li><li>Strengthened&nbsp;territorial&nbsp;cohesion&nbsp;between&nbsp;Bucharest&nbsp;and&nbsp;surrounding&nbsp;regions.</li></ul>"],"originalDescriptions":["The overall objective of the development of and integrated road infrastructure in Bucharest orbital area (hereby called “the project”) is to provide the package of integrated measures aimed to meet the requirements of Regulation EU no. 1315/2013 on the TEN-T Core network. Thus, the project aims to provide an appropriate mixture of “high quality road” infrastructure, as part of the national infrastructure network, to accommodate long distance freight and passenger traffic as well as local traffic specific to the metropolitan area, while ensuring an appropriate level of traffic safety and security. After the project is Finalised, it will contribute to the Accomplishment of the general objective of LIOP, 2014-2020, Priority Axis no. 1 Improving mobility by developing the TEN-T and subway network, Specific Objective 1.1: “Increasing mobility on the central TEN-T road network”. The specific objectives of the project are: • Component 1 – Bucharest Bypass Motorway – Southern Sector: construction of 51.195 km of 2x2 new motorway section, including 9 bridges, 33 overpasses, 5 interchanges, 4 parking areas, 1 Coordination and Maintenance Center, 1 Maintenance Supporting Point and 1 service area; • Component 2 – Modernisation of Bucharest Ring Road between A1 – DN7 and DN2 – A2 – Modernisation of 20.274 km of national road on A1 – DN7 and DN2 – A2 Sectors, part of the existing Bucharest Bypass (of which 8.750 km for A1 – DN7 Sector and 11.524 km for DN2 – A2 Sector), including 16 intersections, the construction of 3 bridges, 4 overpasses and 2 parking areas, the rehabilitation of 1 bridge and 3 overpasses; • Component 3 – Domnesti DJ602 Intersection, including 2 level Roundabouts, 2 collecting roads; • Component 4 – Oltenita DN4 and Berceni DJ401 Intersections and widening the Ring Road in between, including 4 levelabouts, and 4 collecting roads, as well as the widening of DNCB section between them (6.1 km); • Component 5 – Mogosoaia DN1A Intersection • Component 6 – Modernisation of Bucharest Ring Road between A1 – DN5- Widening to 4 lanes of 14.525 km ring road, including 5 intersections with classified roads, the construction of 3 new passages, 3 parking areas and the rehabilitation of 1 passage; Additionally, the project implementation will: • Ensure an adequate interconnectivity of all inter-regional corridors, with the network of adjacent national roads and motorways; • Ensure adequate accessibility to the TEN-T network from/to the local road network and the city of Bucharest. • Ensure a higher quality of the existing infrastructure by providing improved traffic safety conditions."],"startTimes":["2014-01-01"],"endTimes":["2023-12-31"],"euBudgets":["876915859,56"],"totalBudgets":["1031665717,12"],"images":[],"copyrightImages":[],"coordinates":["25.9424147,44.5612356"],"objectiveIds":["TO07"],"countrycode":["RO"]},{"link":"https://linkedopendata.eu/entity/Q3095656","item":"Q3095656","snippet":[],"labels":["Express road Craiova – Pitesti"],"originalLabels":["Express road Craiova – Pitesti"],"descriptions":["The general objective of the project is to provide a high quality road between the cities of Pitesti and Craiova while ensuring a link between the two branches of the TEN-T Core Rhin-Danube Corridor in Romania. Thus, in line with the national transport strategy defined in the GTMP and the specific objectives of the LIOP, the project aims to: — improve the economic efficiency of the national transport network in Romania and increase mobility by reducing travel times between Pitesti and Craiova and generating reduced travel costs; — improve regional and national accessibility by ensuring interconnectivity of the south-western region of the country with the TEN-T Core national network; — improve traffic safety conditions by reducing the number of accidents; — reduce the air and noise pollution and improve the quality of life of the population in the project area by rerouting long distance traffic outside of numerous localities currently crossed by the existing road infrastructure. The project is proposed to be funded under LIOP, Priority Axis 1: “Improving mobility by developing the TEN-T and subway network”, Thematic objective 07, Specific Objective 1.1: “Increasing mobility on the central TEN-T road network” as amended in July 2020 to include investments on TEN-T comprehensive network which complement TEN-T core projects to ensure regional and international accessibility."],"originalDescriptions":["The general objective of the project is to provide a high quality road between the cities of Pitesti and Craiova while ensuring a link between the two branches of the TEN-T Core Rhin-Danube Corridor in Romania. Thus, in line with the national transport strategy defined in the GTMP and the specific objectives of the LIOP, the project aims to: — improve the economic efficiency of the national transport network in Romania and increase mobility by reducing travel times between Pitesti and Craiova and generating reduced travel costs; — improve regional and national accessibility by ensuring interconnectivity of the south-western region of the country with the TEN-T Core national network; — improve traffic safety conditions by reducing the number of accidents; — reduce the air and noise pollution and improve the quality of life of the population in the project area by rerouting long distance traffic outside of numerous localities currently crossed by the existing road infrastructure. The project is proposed to be funded under LIOP, Priority Axis 1: “Improving mobility by developing the TEN-T and subway network”, Thematic objective 07, Specific Objective 1.1: “Increasing mobility on the central TEN-T road network” as amended in July 2020 to include investments on TEN-T comprehensive network which complement TEN-T core projects to ensure regional and international accessibility."],"startTimes":["2018-12-21"],"endTimes":["2023-12-31"],"euBudgets":["707523520,65"],"totalBudgets":["832380612,53"],"images":["https://kohesio.ec.europa.eu/images/major_4502.jpg"],"copyrightImages":["© European Union"],"coordinates":["25.988449512904,44.43803145","26.0469826,44.3846031"],"objectiveIds":["TO07"],"countrycode":["RO"]},{"link":"https://linkedopendata.eu/entity/Q85988","item":"Q85988","snippet":[],"labels":["Works on the railway no. 7 Warszawa Wschodnia Osobowa – Dorohusk on the Warsaw – Otwock – Dęblin – Lublin section, stage I"],"originalLabels":["Works on the railway no. 7 Warszawa Wschodnia Osobowa – Dorohusk on the Warsaw – Otwock – Dęblin – Lublin section, stage I"],"descriptions":["The subject of the project is the modernisation of the railway line No. 7 on the Otwock – Lublin section (from 26.050 km to 175.850 km), together with work on the travelling line no.30 on the Łuków-Parczew section and preparation of project documentation for the section Warszawa Wschodnia – Otwock. The implementation of the investment provides for: remodeling of the tracks (the second track’s good on pc. Otwock-Pilava, easing arches), modernisation, reconstruction and construction of new engineering facilities: bridges, viaducts, culverts, pedestrian crossings, replacement of overhead and traffic control systems (computer controlled), construction of animal crossings, reconstruction of platforms and their equipment, construction of traffic control system, construction of acoustic screens, renovation of the drainage system of the railway line. In addition, in order to provide a touring route for trains during the modernisation of railway line No. 7, the project and construction works on the Łuków-North Lublin railway line on the Łuków-Parczew section were planned."],"originalDescriptions":["The subject of the project is the modernisation of the railway line No. 7 on the Otwock – Lublin section (from 26.050 km to 175.850 km), together with work on the travelling line no.30 on the Łuków-Parczew section and preparation of project documentation for the section Warszawa Wschodnia – Otwock. The implementation of the investment provides for: remodeling of the tracks (the second track’s good on pc. Otwock-Pilava, easing arches), modernisation, reconstruction and construction of new engineering facilities: bridges, viaducts, culverts, pedestrian crossings, replacement of overhead and traffic control systems (computer controlled), construction of animal crossings, reconstruction of platforms and their equipment, construction of traffic control system, construction of acoustic screens, renovation of the drainage system of the railway line. In addition, in order to provide a touring route for trains during the modernisation of railway line No. 7, the project and construction works on the Łuków-North Lublin railway line on the Łuków-Parczew section were planned."],"startTimes":["2015-11-20"],"endTimes":["2023-03-31"],"euBudgets":["685248600,00"],"totalBudgets":["806174850,00"],"images":["https://ec.europa.eu/regional_policy/images/projects/upload/Rewucki_Maciej_DGSCIC00642960.jpg"],"copyrightImages":["© mapadotacji.gov.pl"],"coordinates":["21.3583205,52.072757","21.6076513,51.8997521","22.006243331675,51.6622359","22.07029594775,51.4187204","22.438471588764,51.1341517"],"objectiveIds":["TO07"],"countrycode":["PL"]},{"link":"https://linkedopendata.eu/entity/Q2017421","item":"Q2017421","snippet":[],"labels":["ROUTE NA-BA, 1TH ROUTE: VARIANT OF THE NAPOLI-CANCELLO LINE"],"originalLabels":["ROUTE NA-BA, 1TH ROUTE: VARIANT OF THE NAPOLI-CANCELLO LINE"],"descriptions":["THIS BECOMES THE FIRST PART OF THE NAPLES-BARI ROUTE WHICH IS THE VARIANT OF THE NAPLES DIVISION BETWEEN THE NAPLES AND BARI ROUTES, WHICH FORMS PART OF THE NEW HS STATION AT NAPLES AFRAGOLA, WHICH INCORPORATES THE HISTORICAL INTEGRATION OF THE HISTORICAL LINES WITH THE HS/AC SYSTEM. THE PROJECT AIMS TO IMPROVE: Â OF THE COMPETITIVENITIVENITARITY OF RAIL TRANSPORT THROUGH THE INCREASE OF THE PERFORMANCE LEVELS Â TOWARDS THE INTEGRATION OF THE SOUTH-EAST RAIL NETWORK WITH THE HS/AC SYSTEM, RESULTING IN A GENERAL INCREASE IN TERMS OF RAIL SERVICE OFFERINGS FOR NOON. Â TO SUPPLEMENT THE INTEGRATION OF THE RAILWAY LINE WITH SPECIAL FACILITIES Â TOWARDS LOGISTICS AND LOGISTICS, LEADING TO AN INCREASE IN RAIL FREIGHT SHARES, IN LINE WITH THE HUB SYSTEM (E.G. INTERMODAL PLATFORMS, PORTS) FORESEEN IN THE NEW ALIGNMENT OF THE TEN-T NETWORK."],"originalDescriptions":["THIS BECOMES THE FIRST PART OF THE NAPLES-BARI ROUTE WHICH IS THE VARIANT OF THE NAPLES DIVISION BETWEEN THE NAPLES AND BARI ROUTES, WHICH FORMS PART OF THE NEW HS STATION AT NAPLES AFRAGOLA, WHICH INCORPORATES THE HISTORICAL INTEGRATION OF THE HISTORICAL LINES WITH THE HS/AC SYSTEM. THE PROJECT AIMS TO IMPROVE: Â OF THE COMPETITIVENITIVENITARITY OF RAIL TRANSPORT THROUGH THE INCREASE OF THE PERFORMANCE LEVELS Â TOWARDS THE INTEGRATION OF THE SOUTH-EAST RAIL NETWORK WITH THE HS/AC SYSTEM, RESULTING IN A GENERAL INCREASE IN TERMS OF RAIL SERVICE OFFERINGS FOR NOON. Â TO SUPPLEMENT THE INTEGRATION OF THE RAILWAY LINE WITH SPECIAL FACILITIES Â TOWARDS LOGISTICS AND LOGISTICS, LEADING TO AN INCREASE IN RAIL FREIGHT SHARES, IN LINE WITH THE HUB SYSTEM (E.G. INTERMODAL PLATFORMS, PORTS) FORESEEN IN THE NEW ALIGNMENT OF THE TEN-T NETWORK."],"startTimes":["2008-12-22"],"endTimes":[],"euBudgets":["114034507,00"],"totalBudgets":["799315676,34"],"images":["https://kohesio.ec.europa.eu/images/5057.jpg"],"copyrightImages":["© European Commission"],"coordinates":["14.2901223,40.9045572","14.31023,40.957112","14.310831,40.926012","14.342932,40.878411","14.3511247,40.9148194","14.3750083,40.9460532"],"objectiveIds":["TO07"],"countrycode":["IT"]},{"link":"https://linkedopendata.eu/entity/Q3095742","item":"Q3095742","snippet":[],"labels":["VISION 2020"],"originalLabels":["VISION 2020"],"descriptions":["Develop and strengthen the Responsible Authorities’ Disaster Response Capacity and HILP (High Impact Low Probability) by developing the following strategic pillars: land, sea, air, command and control."],"originalDescriptions":["Develop and strengthen the Responsible Authorities’ Disaster Response Capacity and HILP (High Impact Low Probability) by developing the following strategic pillars: land, sea, air, command and control."],"startTimes":["2020-04-30"],"endTimes":["2023-12-31"],"euBudgets":["549479859,02"],"totalBudgets":["646446892,97"],"images":["https://kohesio.ec.europa.eu/images/4366.jpg"],"copyrightImages":["© European Union"],"coordinates":["21.346001,45.9916285","21.886998807718,45.28966575","22.2346931,47.6056157","23.053216663738,47.1812883","23.8440254,45.1334549","24.1796663,46.848284","24.2153706,46.828672","24.6813844,44.1197692","25.4626340825,44.9275061","25.801398,46.3613888","25.9424147,44.5612356","26.1027202,44.4361414","26.1332036,44.4239885","26.3110915,45.6041831","26.3534278,45.5797774","26.3701504,44.7627982","26.9045947,47.4994809","27.2248453,45.2432075","27.4215048,46.1253405","28.80503357282,45.17756315"],"objectiveIds":["TO05"],"countrycode":["RO"]},{"link":"https://linkedopendata.eu/entity/Q7416015","item":"Q7416015","snippet":[],"labels":["Transylvania motorway, Nusfalau - Biharia section, including the connection road to Oradea"],"originalLabels":["Transylvania motorway, Nusfalau - Biharia section, including the connection road to Oradea"],"descriptions":["The overall objective of the project is to contribute to regional development by providing a modern connection to Hungary as well as improved transit conditions for international traffic. The new link will reduce travel time, vehicle operating costs and residents' exposure to air and noise pollutants, and improve the quality of life for local residents along the access routes. The completion of the project will achieve the following general objectives, which are typical for projects of this type and are in line with EU, national, regional and local objectives: • Improving infrastructure, which is an essential condition for improving the quality of life, the physical environment and the living environment; • Contribute to setting the right conditions for sustainable economic growth in the region; • Support for regional and social development and cohesion; • Ensure sufficient capacity to cope with precon growth"],"originalDescriptions":["The overall objective of the project is to contribute to regional development by providing a modern connection to Hungary as well as improved transit conditions for international traffic. The new link will reduce travel time, vehicle operating costs and residents' exposure to air and noise pollutants, and improve the quality of life for local residents along the access routes. The completion of the project will achieve the following general objectives, which are typical for projects of this type and are in line with EU, national, regional and local objectives: • Improving infrastructure, which is an essential condition for improving the quality of life, the physical environment and the living environment; • Contribute to setting the right conditions for sustainable economic growth in the region; • Support for regional and social development and cohesion; • Ensure sufficient capacity to cope with precon growth"],"startTimes":["2020-09-30"],"endTimes":["2026-06-30"],"euBudgets":["279872142,23"],"totalBudgets":["699680355,58"],"images":[],"copyrightImages":[],"coordinates":["22.192752,46.9926899","23.0191923,47.1561868"],"objectiveIds":["PO03"],"countrycode":["RO"]},{"link":"https://linkedopendata.eu/entity/Q7491075","item":"Q7491075","snippet":[],"labels":["Crete–Attica Electricity Interconnection – Phase II, 2nd Stage"],"originalLabels":["Interconnection of Crete with ESMIE Phase II Interconnection DC capacity 2x500MW Crete Attica 2nd stage"],"descriptions":["<p><strong>Ending Crete’s electricity isolation through a high-capacity link with mainland Greece</strong></p><h3></h3><h3>Overview</h3><p>This Cohesion Policy project supports the second stage of <strong>Phase II of the electricity interconnection between Crete and Attica</strong>, one of the most important energy infrastructure investments in Greece.</p><p>For decades, Crete depended heavily on local oil-fired power plants to cover its electricity needs. This created high costs, environmental pressure and supply-security challenges, especially during periods of high demand. The Crete–Attica interconnection changes this situation by linking the island more fully to the mainland electricity transmission system.</p><p>The project concerns a <strong>high-voltage direct current connection with a capacity of 2 × 500 MW</strong>, allowing electricity to flow between Attica and Crete. It is part of the wider effort to integrate Greek islands into the national grid, reduce dependence on fossil-fuel-based local generation and support the use of renewable energy.</p><h3></h3><h3>Objectives</h3><ul><li><strong>End Crete’s electricity isolation</strong> by connecting the island to the mainland transmission system.</li><li><strong>Improve security of electricity supply</strong> for residents, businesses and public services in Crete.</li><li><strong>Reduce dependence on oil-fired local power generation</strong>, which has historically been used to ensure the island’s energy adequacy.</li><li><strong>Support the integration of renewable energy</strong>, by allowing Crete’s electricity system to operate as part of the wider Greek grid.</li><li><strong>Strengthen Greece’s electricity transmission network</strong> with a technically advanced submarine and underground HVDC link.</li></ul><h3></h3><h3>Key Features and Activities</h3><ul><li><strong>High-voltage direct current connection:</strong> The project supports a 2 × 500 MW HVDC electricity link between Crete and Attica.</li><li><strong>Submarine cable infrastructure:</strong> The interconnection includes one of the deepest and most technically demanding submarine cable routes in Europe, crossing the Aegean Sea between Attica and Crete.</li><li><strong>Underground cable sections:</strong> The system also includes underground cable routes connecting the landing points to converter stations.</li><li><strong>Converter stations:</strong> Specialised converter infrastructure allows electricity to be transferred between direct current transmission and the alternating current grid.</li><li><strong>Grid integration:</strong> The project connects Crete to the Hellenic Electricity Transmission System, enabling a more stable and flexible electricity supply.</li></ul><h3></h3><h3>Target Audience</h3><ul><li><strong>Residents of Crete</strong>, who benefit from more secure electricity supply.</li><li><strong>Businesses and tourism operators</strong>, for whom reliable energy is essential.</li><li><strong>Public services and critical infrastructure</strong>, including hospitals, schools, ports and local administrations.</li><li><strong>Energy operators and grid managers</strong>, who gain a stronger and more flexible electricity transmission system.</li><li><strong>Greek citizens more broadly</strong>, as the project contributes to lower system costs and cleaner electricity supply.</li></ul><h3></h3><h3>Impact</h3><ul><li><strong>Improved energy security:</strong> Crete is no longer dependent mainly on isolated local electricity generation.</li><li><strong>Lower environmental pressure:</strong> Replacing oil-fired generation with power from the mainland grid helps reduce emissions linked to electricity production on the island.</li><li><strong>Support for renewables:</strong> The interconnection increases the ability to integrate renewable energy into the Greek electricity system.</li><li><strong>Reduced electricity system costs:</strong> The project is expected to generate major annual savings by replacing expensive local fuel-based generation.</li><li><strong>Strategic infrastructure value:</strong> The Crete–Attica link is described by the project promoter as the largest project in the history of the Greek electricity transmission system.</li><li><strong>Territorial cohesion:</strong> The project directly addresses the disadvantage of island geography by giving Crete access to infrastructure standards closer to those of mainland regions.</li></ul><h3></h3><h3>Recent Developments &amp; Context</h3><p>The construction of the Crete–Attica interconnection was completed in late 2024, with cable system acceptance tests successfully completed in early 2025. The transfer of direct current through the line began in May 2025, marking the start of operational use.</p><p>The project promoter, Ariadne Interconnection, now presents the Crete–Attica interconnection as a completed reality. This means the project has moved beyond construction and is now part of Greece’s wider energy transition, helping Crete shift away from oil-fired local generation and become more integrated into the national electricity system.</p><p></p><p>The Kohesio fiche Q7491075 should be read as the <strong>2021–2027 Cohesion Policy operation supporting the second stage of Phase II</strong>. It relates to the same broader Crete–Attica interconnection described in earlier European Commission material, but it is not the same administrative operation as the earlier 2014–2020 stage.</p><h3></h3><h3>Related Kohesio Project Fiches</h3><p>These projects are related context only:</p><ul><li><strong>Q3128461</strong> – Interconnection project between Crete and ESMIE, Phase I: AC 150 kV, 2 × 200 MVA.</li><li><strong>Q3128458</strong> – Interconnection of the Cyclades with the Continental Interconnected High Voltage System.</li><li><strong>Q3128411</strong> – Replacement of submarine cables Livadi, Northern Evia.</li><li><strong>Q3128460</strong> – Modernisation of ADMIE Control Centres Infrastructure.</li></ul><h3></h3><h3>Relevant Websites</h3><ul><li>Ariadne Interconnection – <a href=\"about:blank\" rel=\"noopener noreferrer\" target=\"_blank\">https://www.ariadne-interconnection.gr/en</a></li><li>IPTO / ADMIE Crete–Attica project page – <a href=\"about:blank\" rel=\"noopener noreferrer\" target=\"_blank\">https://www.admie.gr/en/erga/erga-diasyndeseis/ilektriki-diasyndesi-kritis-attikis</a></li><li>European Commission Regional Policy project story, earlier stage – <a href=\"about:blank\" rel=\"noopener noreferrer\" target=\"_blank\">https://ec.europa.eu/regional_policy/projects/projects-database/electricity-connection-between-attica-and-crete-greece-to-ensure-security-of-energy-supply_en</a></li><li>European Investment Bank project page – <a href=\"about:blank\" rel=\"noopener noreferrer\" target=\"_blank\">https://www.eib.org/en/projects/all/20200122</a></li></ul><h3></h3><h3>Video</h3><ul><li>“Interconnecting the Future: The Crete–Attica Interconnection” – https://www.youtube.com/watch?v=TgoMLfLOedw </li><li>“Setting New Records: The Epic Journey of Crete–Attica Interconnection” – https://www.youtube.com/watch?v=cefJbkDmn4c </li></ul><h3></h3><h3>Social Media</h3><ul><li>Ariadne Interconnection – LinkedIn: <a href=\"about:blank\" rel=\"noopener noreferrer\" target=\"_blank\">https://gr.linkedin.com/company/ariadne-interconnection</a></li><li>IPTO / ADMIE – YouTube: https://www.youtube.com/@ipto </li><li>IPTO / ADMIE – Facebook: <a href=\"about:blank\" rel=\"noopener noreferrer\" target=\"_blank\">https://www.facebook.com/admieipto/</a></li></ul>"],"originalDescriptions":["The electricity interconnection of Crete with Attica is currently the largest investment both in terms of cost and in terms of technical complexity for the transmission of electricity made in Greece with the aim of ending the electrical isolation of Crete from the mainland electricity grid and covering the increased future needs of the island Note that this project is the largest in length and depth under construction cable submarine and underground high voltage direct current interconnection in Greece The proposed project concerns the completion of Phase II of the project that makes it possible to supply a significant part of the island's load by ESMIE and in combination with Phase I of the interconnection of Crete with the Peloponnese leads to the complete de-dependence of the island from the fuel oil production units that until now ensured its energy adequacy. It is a project of strategic national importance with great added value that has been characterized by the Decision of the Minister of Energy ILVF82954oik 18457812122017 as a project of general importance for the country's economy The two phases of the Interconnection constitute the largest project in terms of technological innovation and complexity budget that has been implemented to date in the Greek Electricity Transmission System."],"startTimes":["2021-01-01"],"endTimes":["2027-12-31"],"euBudgets":["183120374,82"],"totalBudgets":["454673663,46"],"images":["https://kohesio.ec.europa.eu/images/a03e681b-3a61-466a-9a55-eb2d604c4ddb.jpg"],"copyrightImages":["© ARIADNΕ INTERCONNECTION SINGLE MEMBER S.P.S.A."],"coordinates":["23.7348324,37.9755648"],"objectiveIds":["PO02"],"countrycode":["GR"]},{"link":"https://linkedopendata.eu/entity/Q2734676","item":"Q2734676","snippet":[],"labels":["Road connectivity with South Dalmatia"],"originalLabels":["Road connectivity with South Dalmatia"],"descriptions":["The Notice on the Amendment of lesser importance No1 and No 1 (addendum) resulted in a change of project leader. New budget items have created new ones. A new model for financial information was submitted to the beneficiary on 27.3.2018, which included the said amendment to the budget items."],"originalDescriptions":["The Notice on the Amendment of lesser importance No1 and No 1 (addendum) resulted in a change of project leader. New budget items have created new ones. A new model for financial information was submitted to the beneficiary on 27.3.2018, which included the said amendment to the budget items."],"startTimes":["2016-06-01"],"endTimes":["2023-11-30"],"euBudgets":["362761392,33"],"totalBudgets":["426778108,62"],"images":["https://kohesio.ec.europa.eu/images/4195_croatia_pelje_ac_bridge___pixabay.jpg"],"copyrightImages":["© Creative Commons (Pixabay)"],"coordinates":["15.962231476594,45.84264135","15.971092734285,45.806308505021"],"objectiveIds":["TO07"],"countrycode":["HR"]},{"link":"https://linkedopendata.eu/entity/Q7417505","item":"Q7417505","snippet":[],"labels":["Highway Sibiu - Pitesti (section 2)"],"originalLabels":["Highway Sibiu - Pitesti (section 2)"],"descriptions":["The general objective of the Sibiu-Pitesti motorway, as defined in the MPGT, is to improve the economic efficiency of Romanian transport, by improving the travel time between Sibiu and Pitesti and implicitly improving connectivity at regional level. The objective of the corridor is to provide direct access to the Black Sea through a unified motorway profile as well as to other countries through border connections. The new motorway is the first to cross the Carpathian Mountains and will bring significant development opportunities for all communities from the north to the south of Romania. Thus, the project aims to provide an appropriate mix of ‘high-quality road’ infrastructure, as part of the national infrastructure network, to accommodate long-distance freight and passenger traffic, as well as local traffic specific to the metropolitan area, while ensuring an adequate level of traffic safety and security."],"originalDescriptions":["The general objective of the Sibiu-Pitesti motorway, as defined in the MPGT, is to improve the economic efficiency of Romanian transport, by improving the travel time between Sibiu and Pitesti and implicitly improving connectivity at regional level. The objective of the corridor is to provide direct access to the Black Sea through a unified motorway profile as well as to other countries through border connections. The new motorway is the first to cross the Carpathian Mountains and will bring significant development opportunities for all communities from the north to the south of Romania. Thus, the project aims to provide an appropriate mix of ‘high-quality road’ infrastructure, as part of the national infrastructure network, to accommodate long-distance freight and passenger traffic, as well as local traffic specific to the metropolitan area, while ensuring an adequate level of traffic safety and security."],"startTimes":["2022-02-15"],"endTimes":["2041-07-31"],"euBudgets":["586319200,00"],"totalBudgets":["1465798000,00"],"images":[],"copyrightImages":[],"coordinates":["24.1519202,45.7973912","24.1538719,45.0404536"],"objectiveIds":["PO03"],"countrycode":["RO"]},{"link":"https://linkedopendata.eu/entity/Q2017407","item":"Q2017407","snippet":[],"labels":["RAILWAY AXIS PALERMO -CATANIA — MALESSINA. DOUBLING OF THE SECTION BIOCOCCA-CATENANUOVA"],"originalLabels":["RAILWAY AXIS PALERMO -CATANIA — MALESSINA. DOUBLING OF THE SECTION BIOCOCCA-CATENANUOVA"],"descriptions":["THE PROJECT ENVISAGES A DOUBLING OF THE LINE BETWEEN THE BICOCCA STATION AND CATENANOVA FOR A RANGE OF APPROXIMATELY 38 KM LONG. THE DOUBLE TRACK WILL BE ACHIEVED PARTLY IN CONJUNCTION WITH THIS ZONE AND IN SOME SECTIONS BY BUILDING A NEW DOUBLE TRACK.  THIS WAS DONE WITH THE AIM OF IMPROVING THE COMPETITIVENESS OF RAIL TRANSPORT, INCREASING THE NUMBER OF RAIL SERVICES AND IMPROVING THE STANDARDS OF THE AFFIDABILIT-MOVEMENT STANDARDS. IT IS EXPECTED THAT: Â A SINGLE FAST TRACK OPENING; Â — OPENING UP SECOND TRACK WITH DELETION OF ALL LEVEL CROSSINGS."],"originalDescriptions":["THE PROJECT ENVISAGES A DOUBLING OF THE LINE BETWEEN THE BICOCCA STATION AND CATENANOVA FOR A RANGE OF APPROXIMATELY 38 KM LONG. THE DOUBLE TRACK WILL BE ACHIEVED PARTLY IN CONJUNCTION WITH THIS ZONE AND IN SOME SECTIONS BY BUILDING A NEW DOUBLE TRACK.  THIS WAS DONE WITH THE AIM OF IMPROVING THE COMPETITIVENESS OF RAIL TRANSPORT, INCREASING THE NUMBER OF RAIL SERVICES AND IMPROVING THE STANDARDS OF THE AFFIDABILIT-MOVEMENT STANDARDS. IT IS EXPECTED THAT: Â A SINGLE FAST TRACK OPENING; Â — OPENING UP SECOND TRACK WITH DELETION OF ALL LEVEL CROSSINGS."],"startTimes":["2010-01-01"],"endTimes":[],"euBudgets":["101250000,00"],"totalBudgets":["410593024,00"],"images":["https://kohesio.ec.europa.eu/images/198_4528_sicily_catenanuova_bicocca.jpg"],"copyrightImages":["© © European Union"],"coordinates":["14.695463628843,37.5698093","14.739079,37.622952","14.846497231116,37.5179216","14.966335115513,37.4915162","14.97156031799,37.57811015","15.0873718,37.5023612"],"objectiveIds":["TO07"],"countrycode":["IT"]},{"link":"https://linkedopendata.eu/entity/Q2814720","item":"Q2814720","snippet":[],"labels":["Thessaloniki Metro – Extension to Kalamaria"],"originalLabels":["Extension of Thessaloniki Metro to Kalamaria Main works and supply of trains"],"descriptions":["<h2>Extending Thessaloniki’s new driverless metro to densely populated Kalamaria and building a cleaner, better-connected metropolitan transport system</h2><h2></h2><h2><strong>Overview</strong></h2><p>This Cohesion Policy project extends the <strong>Thessaloniki Metro to Kalamaria</strong>, bringing rapid, high-capacity public transport to densely populated neighbourhoods in the south-east of the metropolitan area.</p><p>The extension adds <strong>4.8 km of underground line and five new stations – Nomarchia, Kalamaria, Aretsou, Nea Krini and Mikra</strong> – to the metro network. It connects with the basic line, which opened in November 2024 and runs for 9.6 km through 13 stations between the New Railway Station and Nea Elvetia.</p><p>Together, the basic line and Kalamaria extension represent the largest major infrastructure project supported by Structural Funds in Greece during the 2014–2020 period and a flagship Cohesion Policy investment in sustainable urban mobility.</p><p>The metro is Greece’s first driverless system and uses fully automated trains and platform screen doors. By offering a fast and reliable alternative to private cars, it addresses some of Thessaloniki’s longstanding challenges: road congestion, time lost in traffic, air pollution and noise.</p><p>The Kalamaria extension is scheduled to <strong>open to passengers at 15:00 on 27 August 2026</strong>, following final authorisation for commercial operation. </p><h2></h2><h2><strong>Objectives</strong></h2><ul><li><strong>Extend high-capacity public transport to Kalamaria</strong>, one of the most densely populated parts of the Thessaloniki metropolitan area.</li><li><strong>Reduce dependence on private cars</strong> by providing a fast, reliable and convenient alternative for everyday journeys.</li><li><strong>Reduce congestion, air pollution and noise</strong> associated with road traffic.</li><li><strong>Improve access to employment, education, services, commercial areas and leisure activities</strong> across Thessaloniki.</li><li><strong>Create the backbone of a sustainable metropolitan mobility system</strong>, integrating metro services with buses and other transport modes.</li><li><strong>Improve the quality of life of residents</strong> through shorter and more predictable journey times.</li><li><strong>Support economic development and the attractiveness of Thessaloniki and Central Macedonia</strong> through better urban connectivity.</li><li><strong>Provide infrastructure capable of supporting future extensions</strong> towards other densely populated parts of the metropolitan area.</li></ul><h2></h2><h2><strong>Key Features and Activities</strong></h2><ul><li><strong>Five new underground stations:</strong> Nomarchia, Kalamaria, Aretsou, Nea Krini and Mikra.</li><li><strong>4.8 km of new underground metro line</strong>, connecting Kalamaria with Thessaloniki’s basic metro network.</li><li><strong>Fully automated operation:</strong> Like the basic line, the extension forms part of a technologically advanced driverless metro system.</li><li><strong>Platform screen doors:</strong> Stations use automatic platform doors to separate passengers from the tracks and improve safety.</li><li><strong>Integrated operation:</strong> The Kalamaria branch operates as part of the same network as the existing New Railway Station–Nea Elvetia line.</li><li><strong>Additional rolling stock:</strong> Nine additional trains have been procured to strengthen the fleet serving the expanded network.</li><li><strong>Accessible stations:</strong> The system is designed to provide modern, accessible public transport, including lifts and other facilities for passengers with reduced mobility.</li><li><strong>Fast connections:</strong> The journey between <strong>Mikra and central Thessaloniki is expected to take around 15 minutes</strong>. </li></ul><h2></h2><h2><strong>Target Audience</strong></h2><ul><li><strong>Residents of Kalamaria and south-eastern Thessaloniki</strong>, particularly people living near the five new stations.</li><li><strong>Daily commuters</strong> travelling to workplaces and commercial centres.</li><li><strong>Students and young people</strong> travelling between residential areas, universities and the city centre.</li><li><strong>People without access to a private car</strong>, who gain a faster and more reliable mobility option.</li><li><strong>Passengers with reduced mobility</strong>, who benefit from accessible modern stations.</li><li><strong>Businesses and employers</strong>, benefiting from improved access for employees and customers.</li><li><strong>Visitors and tourists</strong>, who gain easier access to different parts of the metropolitan area.</li><li><strong>The wider population of Thessaloniki and Central Macedonia</strong>, benefiting from reduced road congestion and pollution.</li></ul><h2></h2><h2><strong>Impact</strong></h2><ul><li><strong>A larger metropolitan metro network:</strong> The Kalamaria extension adds five stations and almost 5 km to Thessaloniki’s new rapid-transit system.</li><li><strong>Major passenger potential:</strong> Hellenic Metro currently estimates that the Kalamaria extension will serve around <strong>63,000 passengers per day</strong>. </li><li><strong>Fewer cars:</strong> Hellenic Metro estimates that the extension could remove approximately <strong>12,000 private cars from the roads each day</strong>. </li><li><strong>Lower emissions:</strong> The same official estimate forecasts a reduction of approximately <strong>43 tonnes of CO₂ emissions per day</strong> attributable to the extension. </li><li><strong>Faster journeys:</strong> Mikra will be approximately 15 minutes from central Thessaloniki by metro.</li><li><strong>Changing travel behaviour:</strong> According to the information provided for the August 2026 inauguration, the basic metro has already recorded <strong>more than 36 million individual passenger journeys during its first 16 months</strong>, accompanied by an estimated 10% reduction in cars entering the city centre.</li><li><strong>Better quality of life:</strong> Faster journeys, less congestion and lower traffic-related pollution benefit residents even when they do not personally use the metro.</li><li><strong>Economic opportunities:</strong> Improved accessibility supports businesses, employment and commercial activity in Kalamaria and across the metropolitan area.</li><li><strong>Long-term urban transformation:</strong> The metro provides a high-capacity public transport backbone around which Thessaloniki can develop a more integrated sustainable urban mobility system.</li></ul><p>The latest published Hellenic Metro estimates for the Kalamaria extension differ from some earlier project forecasts. For consistency, the figures above use the operator’s currently published estimates of <strong>63,000 daily passengers, 12,000 fewer cars and 43 tonnes less CO₂ per day</strong> rather than older projections. </p><h2></h2><h2><strong>Recent Developments &amp; Context</strong></h2><p>The <strong>basic Thessaloniki Metro line entered commercial operation on 30 November 2024</strong>, marking a major change in a city whose public transport had previously depended predominantly on buses. The 9.6 km basic line comprises 13 stations and introduced Greece’s first fully automated driverless metro. </p><p>The next major milestone is now imminent. On <strong>26 August 2026</strong>, Hellenic Metro confirmed that all necessary authorisation had been obtained for the Kalamaria branch to enter commercial operation. The five new stations will open to passengers at <strong>15:00 on Thursday 27 August 2026</strong>. </p><p>Preparations have involved more than simply completing five stations. During 2026, sections of the existing network underwent temporary closures and timetable changes so that the Kalamaria branch could be technically and operationally integrated with the basic line. Final works included signalling, supervision, fare systems, electrical and mechanical installations, lifts, fire detection and other safety systems. </p><p>The extension also forms part of a much broader transformation of mobility in Thessaloniki. To realise the full benefits of the metro, coordination between <strong>Hellenic Metro, THEMA, OSETH, OASTH, regional and municipal authorities and other transport operators</strong> will be important. Integration with buses – including new electric buses – and eventually with rail, port and airport connections can make the metro the central corridor of a genuinely multimodal metropolitan transport system.</p><p>Future expansion is already being considered. Hellenic Metro’s planning includes extensions towards the <strong>north-western municipalities</strong>, including areas towards Stavroupoli, Ampelokipi, Menemeni, Kordelio and Evosmos. The stated planning principle is to prioritise densely populated areas where demand for mass transit is high. </p><p>This wider strategy is also consistent with the EU’s continued Cohesion Policy investment in sustainable urban transport. For the <strong>2021–2027 period</strong>, the European Commission identifies the Thessaloniki Metro extension alongside Athens Metro Line 4 as emblematic sustainable urban transport investments in Greece. </p><p>Thessaloniki is also an important transport and logistics hub for Greece and the wider Balkan region. Developing strong connections between its urban transport system and rail, port, airport and the wider <strong>TEN-T network</strong> can therefore increase the impact of investments made within the city itself.</p><p>Overall, the opening of the Kalamaria extension marks the transition of the Thessaloniki Metro from a newly completed infrastructure project into a growing metropolitan transport network. Cohesion Policy support has played a central role in making that transformation possible.</p><h2></h2><h2><strong>Relevant Websites</strong></h2><ul><li><a href=\"https://www.emetro.gr/?lang=en&amp;page_id=15502&amp;utm_source=chatgpt.com\" rel=\"noopener noreferrer\" target=\"_blank\">Hellenic Metro – Kalamaria Extension</a></li><li><a href=\"https://www.emetro.gr/?page_id=158&amp;utm_source=chatgpt.com\" rel=\"noopener noreferrer\" target=\"_blank\">Hellenic Metro – latest project progress and expected impact</a></li><li><a href=\"https://www.emetro.gr/?p=36058&amp;utm_source=chatgpt.com\" rel=\"noopener noreferrer\" target=\"_blank\">Hellenic Metro – 27 August 2026 opening announcement</a></li><li><a href=\"https://greece.representation.ec.europa.eu/news/egkainia-toy-metro-thessalonikis-ena-orosimo-gia-tin-poli-hari-sti-stirixi-tis-eyropaikis-enosis-2024-11-28_el?utm_source=chatgpt.com\" rel=\"noopener noreferrer\" target=\"_blank\">European Commission – Thessaloniki Metro and EU support</a></li><li><a href=\"https://ec.europa.eu/regional_policy/sources/reports/2021-2027-programming-outcome/report-outcome-2021-2027-cohesion-policy-programming-part2.pdf?utm_source=chatgpt.com\" rel=\"noopener noreferrer\" target=\"_blank\">European Commission – Cohesion Policy in Greece 2021–2027</a></li><li><a href=\"https://www.youtube.com/watch?v=5-GiRGLdDEg\" rel=\"noopener noreferrer\" target=\"_blank\">Thessaloniki Metro, youtube video of Line 1</a></li></ul>"],"originalDescriptions":["The aim of the project is to extend the Thessaloniki Metro to Kalamaria, with a length of 4.8 km, with 5 new metro stations, as well as the supply of the necessary trains for the operation of the expansion.With the operation of the expansion, the Metro will upgrade transport and environmentally populated neighborhoods of the city, contributing to the further reduction of the number of vehicles, by about 20,000 IX, as it is projected to serve more than 50,000 passengers on a daily basis."],"startTimes":["2015-07-01"],"endTimes":["2023-12-31"],"euBudgets":[],"totalBudgets":["389890368,00"],"images":["https://kohesio.ec.europa.eu/images/ab2e1e23-9e37-46ca-9d52-46ff94d76b84.jpg"],"copyrightImages":["© Studio VD"],"coordinates":["22.9554953125,40.900670351994"],"objectiveIds":["TO04"],"countrycode":["GR"]},{"link":"https://linkedopendata.eu/entity/Q3835701","item":"Q3835701","snippet":[],"labels":["Struma Motorway — Lot 3.1, Lot 3.3 and Zheleznitsa Tunnel"],"originalLabels":["Struma Motorway — Lot 3.1, Lot 3.3 and Zheleznitsa Tunnel"],"descriptions":["The project Struma Motorway LOT 3 Blagoevgrad — Sandanski is part of the global project Struma Motorway, located in the south-western part of the country, which passes through Blagoevgrad district, with an approximate length of 134 km and is divided into the following sections:- Division from Dolna Dikanya to Dupnitsa — Lot 1 of Struma Motorway (from km 305+ 220 to km 322+ 000) with length 16.780 km;- Dupnitsa to Blagoevgrad — Lot 2 of Struma Motorway (from km 322+ 000 to km 359+ 483) with a length of 37.480 km;- Division from Blagoevgrad to Sandanski — Lot 3 of Struma Motorway (from km 359+ 000 to km 420+ 624) with length 65.090 km;- Part from Sandanski to the crossing of the border with the Hellenic Republic — Lot 4 of Struma Motorway (423+ 800 to km 438+ 500) with a length of 14.700 km. The project, which is the subject of this application form, includes the design and construction of:- Lot 3.1, from Blagoevgrad to Krupnik from km 359+ 000 to km 373+ 300, with the relevant road junctions, earthworks and facilities, including a section of 4.4 km with Tunnel Zheleznitsa;- Lot 3.1 Tunnel Zheleznitsa with a total length of 4.4 km, including a tunnel Železnitsa with a length of 2.012 km;- Lot 3.3, from Kresna to Sandanski from km 397+ 600 to km 420+ 624=420+ 628.478, with the corresponding road junctions, earthworks and facilities. The construction of Lot 3 of Struma Motorway is a top priority of Operational Programme Transport and Transport Infrastructure (OPTTI) 2014-2020. The construction of Lot 1, 2 and 4 as well as the preparation of Lot 3 are financed under Operational Programme Transport 2007-2013. The design and construction of Lot 3.2 Krupnik-Kresna from km 375+ 900 (according to preliminary studies from 2016)=376+ 000 to km 400+ 371.81 (according to preliminary studies from 2016)=397+ 000 is not part of this Application Form, including Division 373+ 300 to 376+ 000 of Lot 3.1 and Division 397+ 000 to 397+ 600 of Lot 3.3"],"originalDescriptions":["The project Struma Motorway LOT 3 Blagoevgrad — Sandanski is part of the global project Struma Motorway, located in the south-western part of the country, which passes through Blagoevgrad district, with an approximate length of 134 km and is divided into the following sections:- Division from Dolna Dikanya to Dupnitsa — Lot 1 of Struma Motorway (from km 305+ 220 to km 322+ 000) with length 16.780 km;- Dupnitsa to Blagoevgrad — Lot 2 of Struma Motorway (from km 322+ 000 to km 359+ 483) with a length of 37.480 km;- Division from Blagoevgrad to Sandanski — Lot 3 of Struma Motorway (from km 359+ 000 to km 420+ 624) with length 65.090 km;- Part from Sandanski to the crossing of the border with the Hellenic Republic — Lot 4 of Struma Motorway (423+ 800 to km 438+ 500) with a length of 14.700 km. The project, which is the subject of this application form, includes the design and construction of:- Lot 3.1, from Blagoevgrad to Krupnik from km 359+ 000 to km 373+ 300, with the relevant road junctions, earthworks and facilities, including a section of 4.4 km with Tunnel Zheleznitsa;- Lot 3.1 Tunnel Zheleznitsa with a total length of 4.4 km, including a tunnel Železnitsa with a length of 2.012 km;- Lot 3.3, from Kresna to Sandanski from km 397+ 600 to km 420+ 624=420+ 628.478, with the corresponding road junctions, earthworks and facilities. The construction of Lot 3 of Struma Motorway is a top priority of Operational Programme Transport and Transport Infrastructure (OPTTI) 2014-2020. The construction of Lot 1, 2 and 4 as well as the preparation of Lot 3 are financed under Operational Programme Transport 2007-2013. The design and construction of Lot 3.2 Krupnik-Kresna from km 375+ 900 (according to preliminary studies from 2016)=376+ 000 to km 400+ 371.81 (according to preliminary studies from 2016)=397+ 000 is not part of this Application Form, including Division 373+ 300 to 376+ 000 of Lot 3.1 and Division 397+ 000 to 397+ 600 of Lot 3.3"],"startTimes":["2015-09-24"],"endTimes":["2023-09-30"],"euBudgets":["319387886,11"],"totalBudgets":["375750454,25"],"images":["https://kohesio.ec.europa.eu/images/a8a4f1cd-aefd-409d-bc14-82bd7082ad6f.jpg"],"copyrightImages":["© Bulgarian Managing Authority"],"coordinates":["23.487341097624,41.750287"],"objectiveIds":["TO07"],"countrycode":["BG"]},{"link":"https://linkedopendata.eu/entity/Q2734770","item":"Q2734770","snippet":[],"labels":["Reconstruction of existing and construction of a second track on the Croatian Lescovan-Karlovac section on railway line M202 Zagreb Gk-Rijeka"],"originalLabels":["Reconstruction of existing and construction of a second track on the Croatian Lescovan-Karlovac section on railway line M202 Zagreb Gk-Rijeka"],"descriptions":["The project concerns the reconstruction of the existing and construction of a second track on the Croatian Lescovan-Karlovac stakeholders with a length of 44.02 km. It includes: a reconstruction of 3 stations and 4 existing positions, transforming 3 stations into positions• installing the new electronic SS, ETCS level 1 and a remote control system with remote control• electrifying 25 kV/50 Hz• reconstruction of substations• construction of 3 underpasses• construction of 4 underpasses, and the construction of swater roads with the aim of ending the ŽCP• reconstruction of the ŽCP establishments at the level• construction of walls protection walls• construction of a closed drainage system• reconstruction of the establishments on the route."],"originalDescriptions":["The project concerns the reconstruction of the existing and construction of a second track on the Croatian Lescovan-Karlovac stakeholders with a length of 44.02 km. It includes: a reconstruction of 3 stations and 4 existing positions, transforming 3 stations into positions• installing the new electronic SS, ETCS level 1 and a remote control system with remote control• electrifying 25 kV/50 Hz• reconstruction of substations• construction of 3 underpasses• construction of 4 underpasses, and the construction of swater roads with the aim of ending the ŽCP• reconstruction of the ŽCP establishments at the level• construction of walls protection walls• construction of a closed drainage system• reconstruction of the establishments on the route."],"startTimes":["2018-11-01"],"endTimes":["2023-12-31"],"euBudgets":["306967196,10"],"totalBudgets":["361137877,76"],"images":["https://kohesio.ec.europa.eu/images/5161.jpg"],"copyrightImages":["© European Union"],"coordinates":["15.962231476594,45.84264135","15.971092734285,45.806308505021"],"objectiveIds":["TO07"],"countrycode":["HR"]},{"link":"https://linkedopendata.eu/entity/Q3095740","item":"Q3095740","snippet":[],"labels":["Regional project for the development of water and wastewater infrastructure in Cluj and Sălaj counties in 2014-2020"],"originalLabels":["Regional project for the development of water and wastewater infrastructure in Cluj and Sălaj counties in 2014-2020"],"descriptions":["The regional project for the development of water and waste water infrastructure in Cluj and Sălaj counties in 2014-2020 aims to continue the local development strategy of the water and waste water sector in Cluj and Sălaj counties in order to meet the requirements of the Environmental Acquis of the European Union by promoting investments in the field of water and waste water. The overall objective of the project is to: Improving the water and waste water infrastructure in the counties of Cluj and Sălaj by expanding and developing the microbiologically controlled, safe and health protection drinking water service in localities with more than 50 inhabitants and ensuring the collection and treatment of waste water for agglomerations above 2,000 p.e. to comply with the requirements of the European Directives on the quality of water intended for human consumption (Directive 98/83/EC) and on waste water treatment (Directive 91/271/EEC). The project contributes to achieving the results pursued by the programme under OS 3.2. contributing to the result indicators of LIOP – OS 3.2. and to compliance with European directives: the following indicators will be reached in 2023: CO18 = 239.389 place; CO19 = 71.461 p.e. The project will contribute to the socio-economic development of the area primarily by ensuring an improved level of health and comfort for the population, safe and continuous. Socio-economic benefits are properly addressed in Appendix 4/Vol.II-Cost-Benefit Analysis. The project will contribute to the socio-economic development of the area by: improving living conditions in rural areas by establishing waste water collection systems and ensuring the safe and continuous supply of drinking water; economic growth in the project area through improvement of water and wastewater infrastructure; — the creation of new jobs during the execution of the works; resource savings for the population; efficiency of operating costs; earnings for the labour force involved in the execution period. The project involves new job opportunities at both project implementation and investment exploitation stage. For the operation of the water and sewerage systems set up by the project, it is estimated that the staff of the regional operator will be supplemented by 90 posts."],"originalDescriptions":["The regional project for the development of water and waste water infrastructure in Cluj and Sălaj counties in 2014-2020 aims to continue the local development strategy of the water and waste water sector in Cluj and Sălaj counties in order to meet the requirements of the Environmental Acquis of the European Union by promoting investments in the field of water and waste water. The overall objective of the project is to: Improving the water and waste water infrastructure in the counties of Cluj and Sălaj by expanding and developing the microbiologically controlled, safe and health protection drinking water service in localities with more than 50 inhabitants and ensuring the collection and treatment of waste water for agglomerations above 2,000 p.e. to comply with the requirements of the European Directives on the quality of water intended for human consumption (Directive 98/83/EC) and on waste water treatment (Directive 91/271/EEC). The project contributes to achieving the results pursued by the programme under OS 3.2. contributing to the result indicators of LIOP – OS 3.2. and to compliance with European directives: the following indicators will be reached in 2023: CO18 = 239.389 place; CO19 = 71.461 p.e. The project will contribute to the socio-economic development of the area primarily by ensuring an improved level of health and comfort for the population, safe and continuous. Socio-economic benefits are properly addressed in Appendix 4/Vol.II-Cost-Benefit Analysis. The project will contribute to the socio-economic development of the area by: improving living conditions in rural areas by establishing waste water collection systems and ensuring the safe and continuous supply of drinking water; economic growth in the project area through improvement of water and wastewater infrastructure; — the creation of new jobs during the execution of the works; resource savings for the population; efficiency of operating costs; earnings for the labour force involved in the execution period. The project involves new job opportunities at both project implementation and investment exploitation stage. For the operation of the water and sewerage systems set up by the project, it is estimated that the staff of the regional operator will be supplemented by 90 posts."],"startTimes":["2015-04-03"],"endTimes":["2023-12-31"],"euBudgets":["300037549,73"],"totalBudgets":["352985352,63"],"images":["https://kohesio.ec.europa.eu/images/4503_braila_county__romania.jpg"],"copyrightImages":["© European Union"],"coordinates":["22.5561551,47.2147986","22.5897263,47.1573218","22.605914037094,47.228264","22.615760221979,47.298079","22.6982096,47.2998961","22.7074229,47.1992623","22.7345685,47.1570868","22.7382311,47.1290758","22.763749394709,47.383622","22.7929085,47.3235163","22.8292127,47.3426521","22.8390931,47.1051092","22.8597636,46.9172459","22.8618501,47.0673175","22.8641694,47.2314018","22.8677799,47.1629229","22.908721672604,47.1265165","22.9155825,47.2078124","22.9479289,47.1529824","22.985319,46.8300727","23.0147547,47.246446","23.053216663738,47.1812883","23.0579945,46.9190201","23.1010467,47.0671158","23.1058661,46.8382963","23.1196427,47.2297875","23.132898,46.945452","23.1397488,47.3660234","23.1490826,46.292509","23.1832717,47.1116137","23.2341982,47.1968203","23.2376556,46.8721445","23.2633625,47.0024846","23.268106,47.0368526","23.2681312,47.3234528","23.2934979,46.7873332","23.3086824,47.0619133","23.3185054,47.3646527","23.3526552,46.833035","23.3889521,46.7537724","23.3992046,47.0352199","23.4374693,47.2084808","23.4554125,47.3349442","23.4697843,47.3212362","23.4926307,46.9828433","23.5209402,47.0796778","23.5276882,46.7897349","23.5404553,46.861747","23.5460541,46.5405166","23.5569136,46.9607551","23.5684101,46.8994923","23.6181378,46.7146865","23.6431096,47.1411646","23.7546388,46.8021725","23.8157063,46.9121311","23.8317763,46.7507433","23.8537714,47.1969031","23.8746706,47.2956274","23.8961543,46.9313375","23.9199158,47.1677299","23.9389287,46.2103056","23.9597635,46.6617228","24.0511555,47.1121163","24.0514746,46.943357","24.1474856,46.9097318","24.1632811,46.8450442","24.1762666,46.8485083","24.234565,44.9753376","24.4124051,46.3680461","26.0479865,44.4695308","26.1570283,44.4764143","26.7844518,46.2022983"],"objectiveIds":["TO06"],"countrycode":["RO"]}],"numberResults":2275271,"similarWords":[]}